Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor continue working on grading landscaping |
| 03/26/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractors not on site and would like to be on site when we walked this project so he’s going to reschedule this for tomorrow |
| 03/27/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to complete the homes as sidewalks per plant before they get the engineering final |
| 10/01/2025 |
ENGR Engineering Final
|
|
Partial Pass |
I spoke to the contractor. He informed me that there is a revision on this curb out here from vertical curb to wedge curb, and it’s on the bill that was submitted into the city. |