Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP21-0163
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2024 | SITE - Stormwater Follow-up | Partial Pass | No concerns at this time | |
05/14/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | BMPs are required to continue operations on site, plans call for track pad and wattle. Wattle needed across the front and down both sides to walls. | |
05/29/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
06/11/2024 | SITE - Stormwater Follow-up | Partial Pass | No concerns at this time. Everything looks good. | |
06/18/2024 | SITE - Stormwater Follow-up | Not Ready | Contractor is not on site and the gate is locked. Looks like there’s no activity. | |
06/25/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
07/09/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | BMPs are in place at front entrance, walls are keeping the sides of property contained and basins have been rough cut to help with runoff on the east and rear sides of the property. | |
07/23/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time. Everything still in place even after all the rain. | |
08/20/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
09/03/2024 | SITE - Stormwater Follow-up | Passed |