Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | superintendent Lance at 975-2730, Bryan with desert earth excavating. 10 unit subdivision with 10 parking spaces, a trash enclosure and a large basin. None of the native trees are shown to remain. Post address. Schedule regular swppp inspections. Provide controls at Northwest basin opening into grocery store parking lot. Schedule inspection prior to landscaping. |