Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
06/18/2021
Applicant:
James Wright
Description:
Site/Grading/Swppp - Tucson International Airport. ANG-ECF hangar, in kind replacement.

Permit Reviews

Permit Number - DP21-0153
Permit Status: Complete
Permit Description: Site/Grading/Swppp - Tucson International Airport. ANG-ECF hangar, in kind replacement.
Start Date Submittal Complete Date Status  
06/18/2021 DEV PKG - OK TO SUBMIT 06/24/2021 COMPLETED Review Details
06/24/2021 DEV PKG 08/02/2021 COMPLETED Review Details
09/27/2021 DEV PKG - RESUBMITTAL 10/21/2021 COMPLETED Review Details
11/02/2021 DEV PKG - RESUBMITTAL 11/08/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0153
Permite Description: Site/Grading/Swppp - Tucson International Airport. ANG-ECF hangar, in kind replacement.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/11/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 05/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 02/04/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME}
07/05/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready I informed the contractor that the sidewalk on the north west side of the building needed to be replaced because it was damaged. Needed the approval from engineer of Record of all inspections that was performed and approved by the engineer. Needs to send in to the City Of Tucson all approved inspections.
07/17/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready Per Landscape inspection of trees and shrubs
(1) (Velvet Mesquite) in North center depressed landscape area has to be replaced and (6) (Desert Marigold shrubs) in various locations need to be replaced and the (41) required (Fairy Duster shrubs) only (35) remain and (6) need to be replaced and (7) need to be added to the required quantity of (41) and the (Chuparosa shrubs) require (26) and only (24) are present which (6) need to be replaced and (2) added to the required quantity of (26) the (Creoste Bush shrub) count is the required (35) which will require (3) to be replaced the (Prickly Pear) quantity is (40) and only(37) are installed requiring (3) to be added to the site.
07/17/2023 ENGR Engineering Final N/A Not Ready Drainage pipes per Eastern portion of the site have not been inspected during install and backfill. This lack of Inspection will require a Stamped Sealed Certified Letter from the Engineer of Record be provided prior to this final inspection.

The Trash Enclosure for this site has not been constructed per the approved Technical Standards section 8-01.9.0 Single Container Enclosure and will need to be removed and replaced correctly. The only other option for keeping the structure as it is what be seek Authorization from Andy Vera with the City of Tucson Environmental Services/General Services. You could ask that he inspect this site and verify whether or not he will allow the Trash Enclosure to remain as it has been Constructed, if so we will need a Document from that Department prior to the Final Inspection.
07/17/2023 ENGR Grading Final N/A Not Ready Drainage pipes per Eastern portion of the site have not been inspected during install and backfill. This lack of Inspection will require a Stamped Sealed Certified Letter from the Engineer of Record be provided prior to this final inspection.

The Trash Enclosure for this site has not been constructed per the approved Technical Standards section 8-01.9.0 Single Container Enclosure and will need to be removed and replaced correctly. The only other option for keeping the structure as it is what be seek Authorization from Andy Vera with the City of Tucson Environmental Services/General Services. You could ask that he inspect this site and verify whether or not he will allow the Trash Enclosure to remain as it has been Constructed, if so we will need a Document from that Department prior to the Final Inspection.

Sidewalk at entry of site off of Aero Park drive has cracks and damaged areas which need to be removed and replaced accordingly prior to final inspection.

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0153
Permit Description: Site/Grading/Swppp - Tucson International Airport. ANG-ECF hangar, in kind replacement.
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/06/2023 SITE - SWPPP Correction Notice Passed
07/06/2023 PDSD Site/Engineering Division - NPPO Passed
07/06/2023 SITE - SWPPP Violation Notice Passed
07/06/2023 SITE - Stormwater Setup and Controls Passed
07/06/2023 PDSD Engineering Division Pre-Construction SITE Passed
07/06/2023 COT - ENGR - Signage Final Passed
07/25/2023 SITE - Stormwater Final Inspection Passed
07/25/2023 PDSD Site/Engineering Division - Landscaping Passed
07/25/2023 ENGR Engineering Final Passed
01/09/2024 ENGR Grading Final Passed

Documents

File Name Document Type  
DEVELOPMENT PACKAGE 1-36 OF 36.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTORS LETTER OF INTENT.PDF DOCUMENTS VIEW
FUGITIVE DUST PERMIT - PIMA COUNTY DEQ (P21FD0204).PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER 11.2.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 11.01.21.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 08.13.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 09.24.21.PDF DOCUMENTS VIEW
APPLICATION_SIGNED, DEV. PKG..PDF DOCUMENTS VIEW
CONTRACTOR IDENTIFICATION LETTER-ANG-ECF_HANGAR.PDF DOCUMENTS VIEW
CONTRACTOR BOND EXCEPTION-ANG-ECF_HANGAR.PDF DOCUMENTS VIEW
DRAINAGE-MEMO.PDF DOCUMENTS VIEW
SPECIFICATIONS_VOL2_DIV21-33-ANG-ECF_HANGAR.PDF DOCUMENTS VIEW
ONLINE APPLICATION, RECVD 06.11.21.PDF DOCUMENTS VIEW
GEOTECHNICAL-REPORT.PDF DOCUMENTS VIEW