Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 07/17/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Per Landscape inspection of trees and shrubs (1) (Velvet Mesquite) in North center depressed landscape area has to be replaced and (6) (Desert Marigold shrubs) in various locations need to be replaced and the (41) required (Fairy Duster shrubs) only (35) remain and (6) need to be replaced and (7) need to be added to the required quantity of (41) and the (Chuparosa shrubs) require (26) and only (24) are present which (6) need to be replaced and (2) added to the required quantity of (26) the (Creoste Bush shrub) count is the required (35) which will require (3) to be replaced the (Prickly Pear) quantity is (40) and only(37) are installed requiring (3) to be added to the site. |
|
| 07/17/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 07/25/2023 | PDSD Site/Engineering Division - Landscaping | Passed |