Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0153
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
01/09/2024 | ENGR Grading Final | Not Ready | Notes from 07/25/2023 still apply for trash enclosure located on the NE corner of building. Not per COT specifications and will require Engineer of approved plan to certify steel structure. |
|
01/09/2024 | ENGR Grading Final | Passed | ||
01/09/2024 | ENGR Grading Final | Passed | ||
01/09/2024 | ENGR Grading Final | Passed | ||
07/06/2023 | ENGR Grading Final | Not Ready | Grading not ready at this time. | |
07/06/2023 | ENGR Grading Final | Not Ready | landscaping islands no completed per approved plan. | |
07/06/2023 | ENGR Grading Final | Not Ready | Notes for this inspection will be added on 711 2020 | |
07/17/2023 | ENGR Grading Final | Not Ready | Drainage pipes per Eastern portion of the site have not been inspected during install and backfill. This lack of Inspection will require a Stamped Sealed Certified Letter from the Engineer of Record be provided prior to this final inspection. The Trash Enclosure for this site has not been constructed per the approved Technical Standards section 8-01.9.0 Single Container Enclosure and will need to be removed and replaced correctly. The only other option for keeping the structure as it is what be seek Authorization from Andy Vera with the City of Tucson Environmental Services/General Services. You could ask that he inspect this site and verify whether or not he will allow the Trash Enclosure to remain as it has been Constructed, if so we will need a Document from that Department prior to the Final Inspection. Sidewalk at entry of site off of Aero Park drive has cracks and damaged areas which need to be removed and replaced accordingly prior to final inspection. |
|
07/25/2023 | ENGR Grading Final | Not Ready | ||
07/25/2023 | ENGR Grading Final | Not Ready | A signed and sealed certification letter from the engineer of record is needed for all work completed without City of Tucson inspections completed. The trash enclosure is not per City of Tucson specifications per section 8-01.9.0 for a single enclosure detail. It has been constructed out of metal which is not excepted per the environmental services department, Only two bollards were installed at the rear of enclosure which are not solid grouted and the two bollards are not installed,Remove and re-construct per section 8-01.9.0 single container enclosure or contact Andy Vera with ESGS at Park and Ajo and have them provide a approval letter for existing enclosure built incorrectly on site. Portions of the damaged sidewalk were repaired and one more section needs to be completed. Complete all remaining work prior to rescheduling this Inspection and provide a copy of the Cert Letter Stamped and Sealed. |
|
07/25/2023 | ENGR Grading Final | Not Ready | A signed and sealed certification letter from the engineer of record is needed for all work completed without City of Tucson inspections completed. The trash enclosure is not per City of Tucson specifications per section 8-01.9.0 for a single enclosure detail. It has been constructed out of metal which is not excepted per the environmental services department, Only two bollards were installed at the rear of enclosure which are not solid grouted and the two bollards are not installed,Remove and re-construct per section 8-01.9.0 single container enclosure or contact Andy Vera with ESGS at Park and Ajo and have them provide a approval letter for existing enclosure built incorrectly on site. Portions of the damaged sidewalk were repaired and one more section needs to be completed. Complete all remaining work prior to rescheduling this Inspection and provide a copy of the Cert Letter Stamped and Sealed. |
|
07/25/2023 | ENGR Grading Final | Not Ready | A signed and sealed certification letter from the engineer of record is needed for all work completed without City of Tucson inspections completed. The trash enclosure is not per City of Tucson specifications per section 8-01.9.0 for a single enclosure detail. It has been constructed out of metal which is not excepted per the environmental services department, Only two bollards were installed at the rear of enclosure which are not solid grouted and the two bollards are not installed,Remove and re-construct per section 8-01.9.0 single container enclosure or contact Andy Vera with ESGS at Park and Ajo and have them provide a approval letter for existing enclosure built incorrectly on site. Portions of the damaged sidewalk were repaired and one more section needs to be completed. Complete all remaining work prior to rescheduling this Inspection and provide a copy of the Cert Letter Stamped and Sealed. |
|
09/29/2023 | ENGR Grading Final | Passed |