Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP21-0078
Permit Details
Apply Date:
03/29/2021
Applicant:
Description:
Site/Grading/Swppp - Greenlight Cabana Park at The Bridges.
Permit Reviews
Permit Number - DP21-0078
Permit Status: Complete
Permit Description: Site/Grading/Swppp - Greenlight Cabana Park at The Bridges.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/29/2021 | DEV PKG - OK TO SUBMIT | 04/01/2021 | COMPLETED |
04/01/2021 | DEV PKG | 05/27/2021 | COMPLETED |
06/22/2021 | DEV PKG - RESUBMITTAL | 08/03/2021 | COMPLETED |
08/16/2021 | DEV PKG - RESUBMITTAL | 09/03/2021 | COMPLETED |
10/18/2021 | DEV PKG - OK TO SUBMIT | 11/12/2021 | COMPLETED |
11/12/2021 | REVISION - - 1ST | 12/15/2021 | COMPLETED |
11/28/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 01/13/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0078
Permite Description: Site/Grading/Swppp - Greenlight Cabana Park at The Bridges.
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2023 | COT - ENGR - Signage Final | N/A | Partial Pass | Walked site with Ron from Greenlight and electrician could not locate the 20 amp breaker for sign, they will locate today and call back in for Monday the 2nd of October. TC of O level 4 is approved for Pod #1 |
09/29/2023 | ENGR Engineering Final | N/A | Partial Pass | TC of O level 4 for pod #1 Damaged curbs have been repaired and asphalt areas in handicap parking spaces in front of entry to office have been corrected and handicap re-paint will be completed on Monday the 2nd of October. |
09/29/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Stake poles have been competed there area a few plants and shrubs that still need to be replaced. |
09/29/2023 | ENGR Grading Final | N/A | Partial Pass | TC of O level for is approved for pod #1. |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0078
Permit Description: Site/Grading/Swppp - Greenlight Cabana Park at The Bridges.
Total Completed Inspections - 22