Permit: DP21-0078

Parcel: 132131370


Addresses:

1002 E 36TH ST

Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
04/22/2022 SITE - Stormwater Setup and Controls DROBERTS Approved Entered by NGARCIA3 - APPROVED 1102 E 36TH ST
04/22/2022 SITE - Stormwater Setup and Controls DROBERTS Approved Entered by NGARCIA3 - APPROVED 1002 E 36TH ST
04/21/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by NGARCIA3 - CN NO CONCERNS AT IS TIME. 1102 E 36TH ST
04/21/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by NGARCIA3 - CN NO CONCERNS AT IS TIME. 1002 E 36TH ST
04/01/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - CN PLACING 12” AND 18 “ STORM DRAIN PIPE.NORTH WEST OFF OF 36TH ST.
03/30/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - CN. NO CONCERNS AT IS TIME.
03/22/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - CN /INSTALLING 18” STORM DRAIN PIPE.
03/17/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by NGARCIA3 - CN /INSTALLING 30 N 18" PIPE. 1102 E 36TH ST
03/17/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by NGARCIA3 - CN /INSTALLING 30 N 18" PIPE. 1002 E 36TH ST
03/01/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by NGARCIA3 - CN/ INSTALLING 18” DRAINAGE . GOOD AND NO CONCERNS . 1102 E 36TH ST
03/01/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by NGARCIA3 - CN/ INSTALLING 18” DRAINAGE . GOOD AND NO CONCERNS . 1002 E 36TH ST
02/24/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - INSTALLED 300 LF. OF 42” PIPE. THE SOUTH EAST CORNER OF THE PROJECT.
02/09/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - CN /INSTALLING 42” DRAINAGE PIPE.SOUTHEAST OF PROJECT.
02/01/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - CN GOOD INSTALLED 6” PIPE.
01/18/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VVERA1 - CN /LOOKS GOOD AS OF TODAY.
12/01/2023 SITE - Stormwater Setup and Controls Passed