Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Zoning Final
Permit Number - DP21-0078
Inspection Description - SITE - Zoning Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Zoning Final | Not Ready | ||
06/29/2023 | SITE - Zoning Final | Complete (Recurring) | The railing by the mailbox is noncompliant and the railing off the sidewalk coming into the project is noncompliant | |
11/22/2023 | SITE - Zoning Final | Partial Pass | Building # 4 - Repair concrete sidewalk ramp at SW corner of parking lot. Repaired asphalt at SW corner of parking lot where dumpster was removed and remove fence from North side of building #4. Repair or replace continuous crack at NE corner of sidewalk at building # 4. Remove construction debris and materials from parking lot areas. Patch multiple curb and scupper locations thru out parking lot areas for building # 4 |
|
11/27/2023 | SITE - Zoning Final | Passed | ||
12/01/2023 | SITE - Zoning Final | Passed |