Permit: DP20-0272
Permit Details
Apply Date:
12/31/2020
Applicant:
Erin Harris
Description:
Site/Grading - New Drive-Thru for Food Service.
Permit Reviews
Permit Number - DP20-0272
Permit Status: Complete
Permit Description: Site/Grading - New Drive-Thru for Food Service.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/05/2021 | DEV PKG | 01/11/2021 | COMPLETED |
01/12/2021 | DEV PKG - RESUBMITTAL | 01/12/2021 | STOPPED |
03/17/2021 | DEV PKG - RESUBMITTAL | 04/19/2021 | COMPLETED |
05/04/2021 | DEV PKG - RESUBMITTAL | 05/10/2021 | COMPLETED |
12/31/2020 | DEV PKG - OK TO SUBMIT | 01/05/2021 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0272
Permit Description: Site/Grading - New Drive-Thru for Food Service.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/26/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/26/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved. Mike with Epstein. Existing building, addition drive-through only. Trash enclosure and accessible parking listed as existing on plan.} ; {Activity date: 08/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Mike with Epstein. Ramp and drive through and west side of building. } |
|
09/21/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/21/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} | |
09/21/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 09/21/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} | |
11/03/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/03/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 10/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continue. Wet muddy discharge into private parking area. Debris piles on site.} ; {Activity date: 10/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 09/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 09/02/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continues} ; {Activity date: 08/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No issues or concerns for this project} | |
11/03/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/03/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 08/26/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - Partially approved. Install as needed. Project located within existing parking area.} | |
11/10/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Approved} ; {Activity date: 09/21/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready } |
|
12/08/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Mike with Epstein.} ; {Activity date: 10/26/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09180, 09028 not ready} | |
12/09/2021 | ENGR Engineering Final | Passed | {Activity date: 12/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 11/09/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09190, 09027. Partially approved. Corrections at South entry have been completed.} ; {Activity date: 10/14/2021; Status: Correction Required; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Correction required. Newly installed ramps exceed the maximum allowable cross slope Per ICC 405.3. Newly installed midpoint landing exceeds The maximum allowable slope for 405.7.1. The 5 foot landing directly in front of the door requires edge protection per IBC section 1012.10. } |
|
12/09/2021 | ENGR Grading Final | Passed | {Activity date: 12/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 11/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Continued. Temporary fencing in place. Construction trailer is for TI. Shell work appears to be mostly complete. Mike with Epstein} ; {Activity date: 10/13/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Curbs and ramps have been installed. No activity on site at this time temporary fencing locked.} |