Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
565 E WETMORE RD
Apply Date:
12/31/2020
Applicant:
Description:
Site/Grading - New Drive-Thru for Food Service.

Permit Reviews

Permit Number - DP20-0272
Permit Status: Complete
Permit Description: Site/Grading - New Drive-Thru for Food Service.
Start Date Submittal Complete Date Status  
01/05/2021 DEV PKG 01/11/2021 COMPLETED Review Details
01/12/2021 DEV PKG - RESUBMITTAL 01/12/2021 STOPPED Review Details
03/17/2021 DEV PKG - RESUBMITTAL 04/19/2021 COMPLETED Review Details
05/04/2021 DEV PKG - RESUBMITTAL 05/10/2021 COMPLETED Review Details
12/31/2020 DEV PKG - OK TO SUBMIT 01/05/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0272
Permit Description: Site/Grading - New Drive-Thru for Food Service.
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/26/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/26/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved. Mike with Epstein. Existing building, addition drive-through only. Trash enclosure and accessible parking listed as existing on plan.} ; {Activity date: 08/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Mike with Epstein. Ramp and drive through and west side of building.

}
09/21/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/21/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
09/21/2021 COT - ENGR - Signage Final Passed {Activity date: 09/21/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
11/03/2021 SITE - Stormwater Follow-up Passed {Activity date: 11/03/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 10/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continue. Wet muddy discharge into private parking area. Debris piles on site.} ; {Activity date: 10/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 09/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 09/02/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continues} ; {Activity date: 08/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No issues or concerns for this project}
11/03/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 11/03/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 08/26/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - Partially approved. Install as needed. Project located within existing parking area.}
11/10/2021 SITE - Stormwater Final Inspection Passed {Activity date: 11/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Approved} ; {Activity date: 09/21/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready
}
12/08/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Mike with Epstein.} ; {Activity date: 10/26/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09180, 09028 not ready}
12/09/2021 ENGR Engineering Final Passed {Activity date: 12/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 11/09/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09190, 09027. Partially approved. Corrections at South entry have been completed.} ; {Activity date: 10/14/2021; Status: Correction Required; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Correction required. Newly installed ramps exceed the maximum allowable cross slope Per ICC 405.3. Newly installed midpoint landing exceeds The maximum allowable slope for 405.7.1. The 5 foot landing directly in front of the door requires edge protection per IBC section 1012.10.

}
12/09/2021 ENGR Grading Final Passed {Activity date: 12/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 11/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Continued. Temporary fencing in place. Construction trailer is for TI. Shell work appears to be mostly complete. Mike with Epstein} ; {Activity date: 10/13/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Curbs and ramps have been installed. No activity on site at this time temporary fencing locked.}

Documents

File Name Document Type  
1-5 OF 5.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SUBMITTAL COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
ONLINE SUBM PAGE, RECVD 05.04.21.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 03.16.21.PDF DOCUMENTS VIEW
STEVE SHIELDS, ZONING, EMAIL, JAN. 2021.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 03.16.21 AT 5;28 PM.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 01.12.21.PDF DOCUMENTS VIEW
ONLINE FILEDROP PAGE, RECVD 01.12.21 AT 5;20 AM.PDF DOCUMENTS VIEW
APPLICATION SIGNED.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, 12.29.20, 4;11PM.PDF DOCUMENTS VIEW
SUMMARY LETTER FROM KIMLEY HORN, 11.16.20.PDF DOCUMENTS VIEW