Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/09/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. |
| 11/09/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - 09190, 09027. Partially approved. Corrections at South entry have been completed. |
| 10/14/2021 |
ENGR Engineering Final
|
BBENEDON |
Correction Required |
Entered by NGARCIA3 - Correction required. Newly installed ramps exceed the maximum allowable cross slope Per ICC 405.3. Newly installed midpoint landing exceeds The maximum allowable slope for 405.7.1. The 5 foot landing directly in front of the door requires edge protection per IBC section 1012.10.
|
| 12/09/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. |
| 11/09/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - 09190, 09027. Partially approved. Corrections at South entry have been completed. |
| 10/14/2021 |
ENGR Engineering Final
|
BBENEDON |
Correction Required |
Entered by NGARCIA3 - Correction required. Newly installed ramps exceed the maximum allowable cross slope Per ICC 405.3. Newly installed midpoint landing exceeds The maximum allowable slope for 405.7.1. The 5 foot landing directly in front of the door requires edge protection per IBC section 1012.10.
|