Inspection Status: Complete (Recurring)
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/02/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Contacts belongs to retail. Temporary fencing still in place. Building construction
|
| 10/27/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by VVERA1 - Approved |
| 10/26/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Par app. Accessible walkways
Walked the site with Mike from Epstein. |
| 10/21/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Courtesy inspection for Mike. Concrete ramp being poured at 9:15 AM. Reschedule inspection after work has been completed.
|
| 10/20/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by VVERA1 - Partially approved. Preparation for asphalt Repair. |
| 10/14/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved, drive through curbs and islands. |
| 10/05/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Accessibility modifications as needed at front entry. |
| 10/01/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - . Continue. Contractor installing accessible route at entrance. Mike with Epstein. |
| 09/30/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - 09185. Continued. Work on drive-through
|
| 09/28/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - 09185. Continued. Contractor installing curbs.
|
| 09/24/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continue. Drive-through grading in progress. Consult designing engineer for elevation discrepancies at accessible ramp. Mike the Epstein |
| 09/21/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Drive-through curbs
|
| 09/14/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Construction convex, Dumpster, portable toilet and temporary fencing in place. Material piles on site. No activity at this time
|
| 08/26/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Demo of work area. |
| 11/04/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved |
| 11/10/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - . Approved |
| 12/09/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. |
| 11/17/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - . Continued. Temporary fencing in place. Construction trailer is for TI. Shell work appears to be mostly complete. Mike with Epstein |
| 10/13/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Curbs and ramps have been installed. No activity on site at this time temporary fencing locked. |