Permit: DP20-0255
Permit Details
Status:
Inspections
Type:
Development Package
Address:
1138 N RICHEY BL
Address NEW:
1138 N RICHEY BL
Apply Date:
12/21/2020
Applicant:
Jesus Lugo
Description:
SITE/GRADING - New Construction, Units 1,2,3, and 4.
Permit Reviews
Permit Number - DP20-0255
Permit Status: Inspections
Permit Description: SITE/GRADING - New Construction, Units 1,2,3, and 4.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2021 | DEV PKG | 03/09/2021 | COMPLETED |
| 06/25/2021 | DEV PKG - RESUBMITTAL | 08/05/2021 | COMPLETED |
| 11/16/2021 | DEV PKG - RESUBMITTAL | 02/14/2022 | COMPLETED |
| 12/08/2020 | DEV PKG - OK TO SUBMIT | 01/08/2021 | COMPLETED |
| 12/21/2020 | DEV PKG - OK TO SUBMIT | 12/23/2020 | COMPLETED |
| 04/15/2024 | DEVELOPMENT PACKAGE NEW v.1 | 05/22/2024 | REQUIRES RESUBMIT |
| 11/19/2024 | DEVELOPMENT PACKAGE NEW v.6 | 12/03/2024 | APPROVED |
| 09/23/2024 | DEVELOPMENT PACKAGE NEW v.3 | 09/23/2024 | REQUIRES RESUBMIT |
| 06/28/2024 | DEVELOPMENT PACKAGE NEW v.2 | 08/09/2024 | REQUIRES RESUBMIT |
| 10/08/2024 | DEVELOPMENT PACKAGE NEW v.5 | 10/25/2024 | REQUIRES RESUBMIT |
| 02/02/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/11/2024 | REQUIRES RESUBMIT |
| 09/24/2024 | DEVELOPMENT PACKAGE NEW v.4 | 10/07/2024 | IN REVIEW |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP20-0255
Permite Description: SITE/GRADING - New Construction, Units 1,2,3, and 4.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | I contractors not on site inform them that they need to reschedule |
| 01/07/2025 | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections
Permit Number: DP20-0255
Permit Description: SITE/GRADING - New Construction, Units 1,2,3, and 4.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Construction has started prior to the Pre Con meeting taking place. | |
| 07/14/2026 | Consultation SITE | Passed | 7/14/26 Contractor has not had the site graded yet, just the pad. I explained to him the need to have civil cut/fill all the areas to the grading sheet elevations. All built areas and backfilled areas are to be compacted to 95%- except landscape and Water harvesting areas/basins. In paved areas the Subgrade is 6" lower than top of pavement for ABC and Asphalt. Landscape areas are 6" lower than hardscape and basins at least 12 inches lower. Also the slab for the entry patio does not comply with ICC A117.1 and the Inclusive Home Design Ordinance. This slab is 1.5' higher than the adjacent sidewalk. Engineer needs to look at how the sidewalk elevations here can be reconciled and comply. I discussed site inspections needed. I also discussed site inspections needed for the project. |