Permit: DP20-0255
Permit Details
Apply Date:
12/21/2020
Applicant:
Jesus Lugo
Description:
Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
Permit Reviews
Permit Number - DP20-0255
Permit Status: Issued
Permit Description: Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2024 | DEVELOPMENT PACKAGE NEW v.1 | 05/22/2024 | REQUIRES RESUBMIT |
| 11/19/2024 | DEVELOPMENT PACKAGE NEW v.6 | 12/03/2024 | APPROVED |
| 09/23/2024 | DEVELOPMENT PACKAGE NEW v.3 | 09/23/2024 | REQUIRES RESUBMIT |
| 08/19/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | N/A | APPROVED |
| 06/28/2024 | DEVELOPMENT PACKAGE NEW v.2 | 08/09/2024 | REQUIRES RESUBMIT |
| 10/08/2024 | DEVELOPMENT PACKAGE NEW v.5 | 10/25/2024 | REQUIRES RESUBMIT |
| 02/02/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/11/2024 | REQUIRES RESUBMIT |
| 09/24/2024 | DEVELOPMENT PACKAGE NEW v.4 | 10/07/2024 | IN REVIEW |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0255
Permite Description: Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | I contractors not on site inform them that they need to reschedule |
| 01/07/2025 | N/A | Not Ready | ||
| 10/16/2026 | N/A | Partial Pass | okay to pour sidewalks at units, ROW permit required for street curb and sidewalks. Ensure no more than 2% cross slope and 5% running slope. | |
| 10/19/2026 | N/A | Partial Pass | 10-19-2026 Additional plants are needed. Not able to install plants because area is being used for construction of north sidewalk. | |
| 10/19/2026 | N/A | Re-inspection required | 10-19-2026 Trenches were backfilled prior to inspection. Detail #4 irrigation plan and backflow prevention unit need to be inspected to assure installation was per plan. Superintendent was not on site. | |
| 10/30/2026 | Consultation SITE | N/A | Partial Pass | discussed no-step entry. |
| 10/30/2026 | N/A | Partial Pass | consultation inspection | |
| 11/03/2026 | ENGR Grading Final | N/A | Partial Pass | Check elevation of curb at bullnose to the right of the Drive entryway. Place curb cut here per plan for inlet into water infiltration area. At curb cut directly west of unit 2 front door, build up a berm here to channel/direct storm water north into the water infiltration area with Mesquite tree. When this is done we finalize grading inspection. When ABC is ready schedule Paving inspection. |
| 11/09/2026 | ENGR Paving | N/A | Partial Pass | Curb cut needed from last inspection to the south of driveway off of Richey is correct. ABC is compacted and slopes/drainage looks good for the 2" asphalt parking lot.. Contractor informed me compaction tests resulted 100%. Density testing results will be submitted to the permit. Okay to pave parking lot up to the right of way with PAG mix 2 Asphalt pending pictures of a few loose corners that need to be rolled and or tamped with plate tamper.. |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0255
Permit Description: Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Construction has started prior to the Pre Con meeting taking place. | |
| 10/19/2026 | Passed | 10-19-2026- Large DG pile is compliant per plan acceptable for landscaping. Riprap in place behind building for roof runoff /drainage is also acceptable. | ||
| 11/19/2026 | ENGR Paving | Passed |