Permit Details

Status:
Issued
Type:
Development Package
Address:
1138 N RICHEY BL
Address NEW:
1138 N RICHEY BL
Apply Date:
12/21/2020
Applicant:
Jesus Lugo
Description:
Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.

Permit Reviews

Permit Number - DP20-0255
Permit Status: Issued
Permit Description: Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
Start Date Submittal Complete Date Status  
04/15/2024 DEVELOPMENT PACKAGE NEW v.1 05/22/2024 REQUIRES RESUBMIT Review Details
11/19/2024 DEVELOPMENT PACKAGE NEW v.6 12/03/2024 APPROVED Review Details
09/23/2024 DEVELOPMENT PACKAGE NEW v.3 09/23/2024 REQUIRES RESUBMIT Review Details
08/19/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 N/A APPROVED Review Details
06/28/2024 DEVELOPMENT PACKAGE NEW v.2 08/09/2024 REQUIRES RESUBMIT Review Details
10/08/2024 DEVELOPMENT PACKAGE NEW v.5 10/25/2024 REQUIRES RESUBMIT Review Details
02/02/2024 DEVELOPMENT PACKAGE REVIEW v.1 03/11/2024 REQUIRES RESUBMIT Review Details
09/24/2024 DEVELOPMENT PACKAGE NEW v.4 10/07/2024 IN REVIEW Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP20-0255
Permite Description: Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
12/30/2024 PDSD Engineering Division Pre-Construction SITE N/A Not Ready I contractors not on site inform them that they need to reschedule
01/07/2025 N/A Not Ready
10/16/2026 N/A Partial Pass okay to pour sidewalks at units, ROW permit required for street curb and sidewalks. Ensure no more than 2% cross slope and 5% running slope.
10/19/2026 N/A Partial Pass 10-19-2026 Additional plants are needed. Not able to install plants because area is being used for construction of north sidewalk.
10/19/2026 N/A Re-inspection required 10-19-2026 Trenches were backfilled prior to inspection. Detail #4 irrigation plan and backflow prevention unit need to be inspected to assure installation was per plan. Superintendent was not on site.
10/30/2026 Consultation SITE N/A Partial Pass discussed no-step entry.
10/30/2026 N/A Partial Pass consultation inspection
11/03/2026 ENGR Grading Final N/A Partial Pass Check elevation of curb at bullnose to the right of the Drive entryway. Place curb cut here per plan for inlet into water infiltration area. At curb cut directly west of unit 2 front door, build up a berm here to channel/direct storm water north into the water infiltration area with Mesquite tree. When this is done we finalize grading inspection. When ABC is ready schedule Paving inspection.
11/09/2026 ENGR Paving N/A Partial Pass Curb cut needed from last inspection to the south of driveway off of Richey is correct. ABC is compacted and slopes/drainage looks good for the 2" asphalt parking lot.. Contractor informed me compaction tests resulted 100%. Density testing results will be submitted to the permit. Okay to pave parking lot up to the right of way with PAG mix 2 Asphalt pending pictures of a few loose corners that need to be rolled and or tamped with plate tamper..

Completed Inspections

Permit Status: Issued
Permit Number: DP20-0255
Permit Description: Revision 1-SITE/GRADING - New Construction, Units 1,2,3, and 4.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/02/2025 PDSD Engineering Division Pre-Construction SITE Passed Construction has started prior to the Pre Con meeting taking place.
10/19/2026 Passed 10-19-2026- Large DG pile is compliant per plan acceptable for landscaping. Riprap in place behind building for roof runoff /drainage is also acceptable.
11/19/2026 ENGR Paving Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
REV 1 - APPROVED - PLAN SET-REV_1 DP20-0255 REV TO GRADING PLAN ONLY-A1_V1-K1_V1 - STAMPED 08.25.2026.PDF DOCUMENTS VIEW
UPDATED FULL SET_1138 RICHEY_APARTMENTS STAMPED_V1 EDITED.PDF DOCUMENTS VIEW
-DP20-0255 1142 N RICHEY BLVD 5TH RESPONSE.DOCX_V5.PDF DOCUMENTS VIEW
UPDATED FULL SET_1138 RICHEY_APARTMENTS STAMPED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DDO18DDO_FOR_SETBACK_AND_HEIGHT_UDC 1 3_V1 5_V2.PDF DOCUMENTS VIEW
NPPO1138 N RICHEY BLVD_WAIVER_V1 2_V2.PDF DOCUMENTS VIEW
DDO-24-71 DECISION.PDF SPECIAL APPLICATIONS VIEW
DDO NOTICE AND MAP -REVISED.PDF SPECIAL APPLICATIONS VIEW
DDO APPLICATION AND PLANS - REVISED.PDF SPECIAL APPLICATIONS VIEW
2471WITHDRAWN.PDF SPECIAL APPLICATIONS VIEW
DDO APPLICATION AND PLANS.PDF DEVELOPMENT PACKAGE VIEW
DDO NOTICE AND MAP.PDF SPECIAL APPLICATIONS VIEW
3_CONSTRUCTION DOCUMENTS.PDF PLANS UNDER REVIEW VIEW
3-ONLINE SUBMITTAL PAGE, RECVD 11.16.21.PDF PLANS UNDER REVIEW VIEW
3_RESPONSE TO COMMENTS.PDF PLANS UNDER REVIEW VIEW
2_RESPONSE TO COMMENTS.PDF PLANS UNDER REVIEW VIEW
2_PLAN SET.PDF PLANS UNDER REVIEW VIEW
2_ONLINE SUBMITTAL PAGE, RECVD 06.23.21.PDF PLANS UNDER REVIEW VIEW
PIMA CO ADDRESSING REVIEW, 02.05.21.PDF PLANS UNDER REVIEW VIEW
1_APPLICATION.PDF PLANS UNDER REVIEW VIEW
1_DEVELOPMENT PACKAGE, 4 PAGES.PDF PLANS UNDER REVIEW VIEW
1_REFERENCE CONSTRUCTION DOCUMENTS, 18 PAGES.PDF PLANS UNDER REVIEW VIEW
1-ONLINE FILEDROP, RECVD 01.07.21 AT 4;25PM.PDF PLANS UNDER REVIEW VIEW