Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/02/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Construction has started prior to the Pre Con meeting taking place. |
| 12/30/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
I contractors not on site inform them that they need to reschedule |