Inspection History Details
Inspection Status: Not Ready
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | Not Ready | |||
| 03/12/2025 | Not Ready | contractors not on site probably because of the rain this morning. | ||
| 03/17/2025 | Not Ready | Contractors not on site at this time needs to reschedule | ||
| 04/15/2025 | Not Ready | Contractor needs to reschedule | ||
| 07/14/2026 | Not Ready | Contractor has not had the site graded yet, just the pad. I explained to him the need to have civil cut/fill all the areas to the grading sheet elevations. All built areas and backfilled areas are to be compacted to 95%- except landscape and Water harvesting areas/basins. In paved areas the Subgrade is 6" lower than top of pavement for ABC and Asphalt. Landscape areas are 6" lower than hardscape and basins at least 12 inches lower. Also the slab for the entry patio does not comply with ICC A117.1 and the Inclusive Home Design Ordinance. This slab is 1.5' higher than the adjacent sidewalk. Engineer needs to look at how the sidewalk elevations here can be reconciled and comply. I discussed site inspections needed for project. |