Permit: DP20-0153
Permit Details
Status:
Issued
Type:
Development Package
Address:
3139 E BELLEVUE ST
Address NEW:
3139 E BELLEVUE ST
Apply Date:
07/31/2020
Applicant:
Description:
*Revision #2 started 1/18/24* SITE/GRADING - Cornerstone Homes on Bellevue, multi-family, 26 units.
Permit Reviews
Permit Number - DP20-0153
Permit Status: Issued
Permit Description: *Revision #2 started 1/18/24* SITE/GRADING - Cornerstone Homes on Bellevue, multi-family, 26 units.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/03/2021 | DEV PKG - RESUBMITTAL | 03/09/2021 | COMPLETED |
| 07/01/2020 | DEV PKG - OK TO SUBMIT | 08/03/2020 | COMPLETED |
| 08/03/2020 | DEV PKG | 09/10/2020 | COMPLETED |
| 09/20/2021 | DEV PKG - OK TO SUBMIT | 10/11/2021 | COMPLETED |
| 10/11/2021 | REVISION - - 1ST | 10/25/2021 | COMPLETED |
| 11/18/2020 | DEV PKG - RESUBMITTAL | 01/14/2021 | COMPLETED |
| 12/23/2021 | REVISION - - 1ST | 02/10/2022 | COMPLETED |
| 01/18/2024 | DEVELOPMENT PACKAGE NEW v.1 | 02/29/2024 | REQUIRES RESUBMIT |
| 05/08/2024 | DEVELOPMENT PACKAGE NEW v.2 | 05/21/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0153
Permite Description: *Revision #2 started 1/18/24* SITE/GRADING - Cornerstone Homes on Bellevue, multi-family, 26 units.
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2021 | RSBU - Building Final | N/A | Canceled | {Activity date: 06/14/2021; Status: Not Applicable; Inspector: DROBERTS; Comment: Entered by VLEON1 - NOT APPLICABLE IF IT IS ON THIS DEVELOPMENT PACKAGE. TALKED TO THE CONTRACTOR AND ADVISED HIM THAT THIS PERMIT DOES NOT HAVE ANY BUILDING PERMITS ASSOCIATED, AND IT IS ALSO NOT TIED TO DEMO PERMIT IF ONE WAS ISSUED FOR TIS ADDRESS. I HAVE ADVISED THEM TO SCHEDULE THEIR INSPECTION FOR THEIR ENGINEERING PRE$CONSTRUCTION MEETING 09150 WHEN THEY WOULD BE STARTING THE SITE WORK FOR THIS PROJECT.} ; {Activity date: 06/09/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by BSTEVENS - DEMO OF EXISTING BUILDING IS COMPLETE} ; {Activity date: 06/09/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 06/09/2021; Status: Not Applicable; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } |
| 06/22/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 06/22/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No activity on site at this time. Temporary fencing has been repaired and waddle has been installed. } |
| 08/31/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 08/31/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No activity on site at this time. } ; {Activity date: 07/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 06/28/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No activity on site at this time} ; {Activity date: 06/22/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No activity on site at this time. Temporary fencing has been repaired and waddle has been installed. } ; {Activity date: 05/26/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 05/20/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 05/10/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 04/26/2024 | ENGR - Drainage Structures | N/A | Not Ready | Unscheduled courtesy inspection. photo documentation provided Mike and Russ with Cornerstone homes |
| 12/05/2023 | ENGR Grading Final | N/A | Not Ready | site is heavily impacted by cementatios waste and solid waste. no further inspections until site cleaned up. |
| 07/08/2024 | Consultation SITE | N/A | Partial Pass | Items left to complete, 1) Seed basin, either hydro seed or hand spread, if decided to hand spread we must be present while it is being applied. 2) Pull all nursery stakes from trees 3) Remove temp power pole 4) Remove temp fence from site 5) Complete DG ground cover in ares talked about on site visit. Security Camera system can stay until it's needed to pull out |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0153
Permit Description: *Revision #2 started 1/18/24* SITE/GRADING - Cornerstone Homes on Bellevue, multi-family, 26 units.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 07/08/2024 | ENGR Paving | Passed | ||
| 07/08/2024 | Passed | |||
| 07/08/2024 | Passed |
Scheduled Inspections
Scheduled Inspections - DP20-0153
Status: Issued
Description: *Revision #2 started 1/18/24* SITE/GRADING - Cornerstone Homes on Bellevue, multi-family, 26 units.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 02/09/2023 | ENGR Grading Final | Scheduled |