Inspection History Details
Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2024 | Consultation SITE | Partial Pass | Items left to complete, 1) Seed basin, either hydro seed or hand spread, if decided to hand spread we must be present while it is being applied. 2) Pull all nursery stakes from trees 3) Remove temp power pole 4) Remove temp fence from site 5) Complete DG ground cover in ares talked about on site visit. Security Camera system can stay until it's needed to pull out |