Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0135
Permit Details
Apply Date:
06/30/2020
Applicant:
Garry Brav
Description:
Grading/SWPPP/Floodplain - Prince 10, Superpad mass grading.
Permit Reviews
Permit Number - DP20-0135
Permit Status: Issued
Permit Description: Grading/SWPPP/Floodplain - Prince 10, Superpad mass grading.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/02/2020 | DEV PKG - OK TO SUBMIT | 07/02/2020 | COMPLETED |
07/02/2020 | DEV PKG | 08/03/2020 | COMPLETED |
10/22/2020 | DEV PKG - RESUBMITTAL | 11/25/2020 | COMPLETED |
10/20/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/22/2022 | APPROVED |
Conditions
Permit Number - DP20-0135
Permit Status: Issued
Permit Description: Grading/SWPPP/Floodplain - Prince 10, Superpad mass grading.
Date | Description | Comments |
---|---|---|
07/29/2020 | Fill operation must be observed and certified by a geotechnical or soils engineer. (Tech Standard 2-01.12.3) | |
07/29/2020 | The civil engineer of record shall certify the completion of the project. (Tech Standard 2-01.12.2) |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0135
Permite Description: Grading/SWPPP/Floodplain - Prince 10, Superpad mass grading.
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 03/03/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Copy of notice of intent Requested from general contractor} ; {Activity date: 02/10/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Obtained SWPPP information from job site signage} ; {Activity date: 08/05/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued Contractor making preparations to start utility work.} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. V ditch cut along inside site perimeter to catch any silt or debris. } ; {Activity date: 07/08/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Controls needed along north property line due to newly installed materials. Grading in that location in progress.} ; {Activity date: 06/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 05/26/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 05/03/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR CHANGE TO CONTROLS MADE ON THIS DATE} ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME FOR THE WESTERN PORTION OF THE SITE.} ; {Activity date: 02/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Controls installed along temporary perimeter fencing, west side of site along river path. David with BFL.} ; {Activity date: 02/09/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. David with Bfl. 600 feet of waddle staked and overlapped. Cut and berm where discussed and track out protection in place.} ; {Activity date: 01/22/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - PARTIAL WADDLES INSTALLED AS DISCUSSED} |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
11/14/2023 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Partial Pass | |
10/06/2023 | COT - ENGR - Stormwater | N/A | Partial Pass | |
10/25/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
04/16/2024 | SITE - Stormwater Follow-up | N/A | Partial Pass | No activity at this time. |
06/27/2024 | SITE - Stormwater Final Inspection | N/A | Partial Pass | Rough Grading and stabilization at this time. |
10/25/2023 | ENGR Grading Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0135
Permit Description: Grading/SWPPP/Floodplain - Prince 10, Superpad mass grading.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/21/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/21/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. David with Bfl at 392-4255. John works for Presidio civil Architect. Mouradian survey. Provide stormwater controls and call for inspection. Schedule biweekly stormwater follow up inspections. You can access your inspection codes via property research online. Stabilization of pads will be required at end of project unless pads are developed Within a reasonable amount of time. } ; {Activity date: 01/12/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VLEON1 - PARTIAL AT THIS TIME. I WENT TO THE SITE AT 7:30 am AND WALKED THE SITE PRIOR TO THE PRE-CON MEETING STARING. AT 8:00AM THE MEETING STARTED AND WE DISCUSSED WHAT WOULD BE NEEDED FOR THE SITE TO BEGIN, AND THE EXPECTATIONS THROUGH OUT THE CONSTRUCTION OF THIS SITE. THERE WILL BE SOME CHALLENGES WITH THIS SITE IN THE FUTURE DUE TO EXISTING DRAINAGE PATTERN OFF OF SPEEDWAY BL AND THE ADJACENT PROPERTY OF WALGREENS. THE MEETING WAS CONCLUDED AT AROUND 8:40.} |
|
06/26/2024 | ENGR Engineering Final | Passed | Redundant Inspection approved for clarity |