Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP20-0135
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/21/2021 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by RSALDAT1 - Approved. David with Bfl at 392-4255. John works for Presidio civil Architect. Mouradian survey. Provide stormwater controls and call for inspection. Schedule biweekly stormwater follow up inspections. You can access your inspection codes via property research online. Stabilization of pads will be required at end of project unless pads are developed Within a reasonable amount of time. |
01/12/2021 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL AT THIS TIME. I WENT TO THE SITE AT 7:30 am AND WALKED THE SITE PRIOR TO THE PRE-CON MEETING STARING. AT 8:00AM THE MEETING STARTED AND WE DISCUSSED WHAT WOULD BE NEEDED FOR THE SITE TO BEGIN, AND THE EXPECTATIONS THROUGH OUT THE CONSTRUCTION OF THIS SITE. THERE WILL BE SOME CHALLENGES WITH THIS SITE IN THE FUTURE DUE TO EXISTING DRAINAGE PATTERN OFF OF SPEEDWAY BL AND THE ADJACENT PROPERTY OF WALGREENS. THE MEETING WAS CONCLUDED AT AROUND 8:40. |