Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP20-0135

Parcel: 10308001W


Addresses:

3455 N LA CHOLLA BL


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP20-0135

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
04/27/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Wing walls at concrete overflow.
04/07/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Adam with Bfl. Requesting help scheduling inspection for basin overflow inspection.
03/24/2021 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Drainage channel bottom. Courtesy inspection for David with Bfl.
09/29/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Tucson water on site. No other activity at this time. Note reclaimed water facility excessive smell from apparent leak.
06/15/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. No site work at this time. David with Bfl 392-4255
01/29/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE - PLANS RECEIVED FROM JENNIFER WITH BFI.
10/07/2022 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Water utility work
08/11/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Final grading.
03/25/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No activity on site at this time
03/18/2022 ENGR Grading Final DROBERTS Correction Required Entered by VVERA1 - IS CORRECTIONS REQUIRED IN REGARDS TO THE WATER FACILITY ON THIS SITE
02/24/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. No activity on site at this time.
01/11/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Masonry work at the station. No site work at this time.
01/06/2022 ENGR Grading Final BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Basin has small amounts of standing water remaining five days after last rain event. Basin shall drain within 48 hours.
09/29/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utility work in progress
08/27/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No activity on site on this day.
08/17/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Minor erosion of building pads and rough cut basin. No issues offsite.
08/05/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Contractor making preparations to start utility work.
07/09/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Excavating for lift station.
06/23/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Build up of pad number one.
06/18/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Preparation for utility work in progress. David with Bfl
06/03/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Little activity on site at this time
05/18/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. No activity on site at this time. Temporary fencing installed gate locked
04/27/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Wing walls at concrete overflow.
04/21/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Little activity on site. Contractor completing basin overflow.
04/13/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Rough grading and utility preparation’s
04/08/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - PARTIAL APPROVAL BASIN CONCRETE OVERFLOW
03/31/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED AT THIS TIME. THE CONTRACTOR US WORKING ON GRADING MOST OF THE FUTURE PADS, ANS ALSO IS WORKING ON THE CON-ARCH AREA AT THE NORTH WEST CORNER OF THE SITE. THEY HAVE POURED THE FOOTERS FOR THE STRUCTURE AND ARE CURRENTLY WORKING ON INSTALLING THE WALL AND ROOF REBARS FOR THE STRUCTURE.
03/25/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Basin overflow connection to existing drainage canal at northwest corner. Rough grading and material import mostly complete.
03/19/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Continuous importing of materials onto site for One more week. David with BFL at Princeton
03/18/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE GRADING MATERIAL HAULING IN PROGRESS
02/23/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Materials are being tracked onto the site. Grading in progress
02/05/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Grading site. David with Bfl
02/06/2024 ENGR Grading Final Not Ready Grading activities have stopped. Stabilization is required.
06/27/2024 ENGR Grading Final Partial Pass rough grading and basic stabilization and perimeter fencing have been completed at this time.
10/05/2023 ENGR Grading Final Partial Pass
10/25/2023 ENGR Grading Final Partial Pass
10/25/2023 ENGR Grading Final Partial Pass
12/13/2023 ENGR Grading Final Partial Pass Grading activities in progress. No stabilization has been provided.
12/29/2023 ENGR Grading Final Partial Pass Provides stabilization as required
12/29/2023 ENGR Grading Final Partial Pass recent Grading activities along northern and northwestern portion of site. No stabilization has been provided at this time.