Permit: DP20-0135

Parcel: 10308001W


Addresses:

3455 N LA CHOLLA BL

Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
03/03/2022 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by NGARCIA3 - Continued. Copy of notice of intent Requested from general contractor
02/10/2022 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by NGARCIA3 - Continued. Obtained SWPPP information from job site signage
08/05/2021 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by NGARCIA3 - Continued Contractor making preparations to start utility work.
07/29/2021 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. V ditch cut along inside site perimeter to catch any silt or debris.
07/08/2021 SITE - Stormwater Setup and Controls BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Controls needed along north property line due to newly installed materials. Grading in that location in progress.
06/25/2021 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by VLEON1 -
05/26/2021 SITE - Stormwater Setup and Controls IVR USER Cancelled Entered by IVR USER - IVRS - RI canceled
05/03/2021 SITE - Stormwater Setup and Controls DROBERTS Partial Approval Entered by DROBERT5 - MINOR CHANGE TO CONTROLS MADE ON THIS DATE
04/15/2021 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by VLEON1 -
03/31/2021 SITE - Stormwater Setup and Controls DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME FOR THE WESTERN PORTION OF THE SITE.
02/17/2021 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by RSALDAT1 - Continued. Controls installed along temporary perimeter fencing, west side of site along river path. David with BFL.
02/09/2021 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by VLEON1 - Partially approved. David with Bfl. 600 feet of waddle staked and overlapped. Cut and berm where discussed and track out protection in place.
01/22/2021 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by VLEON1 - PARTIAL WADDLES INSTALLED AS DISCUSSED