Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP20-0135
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2022 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Copy of notice of intent Requested from general contractor |
02/10/2022 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Obtained SWPPP information from job site signage |
08/05/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by NGARCIA3 - Continued Contractor making preparations to start utility work. |
07/29/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. V ditch cut along inside site perimeter to catch any silt or debris. |
07/08/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Controls needed along north property line due to newly installed materials. Grading in that location in progress. |
06/25/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by VLEON1 - |
05/26/2021 | SITE - Stormwater Setup and Controls | IVR USER | Cancelled | Entered by IVR USER - IVRS - RI canceled |
05/03/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Partial Approval | Entered by DROBERT5 - MINOR CHANGE TO CONTROLS MADE ON THIS DATE |
04/15/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by VLEON1 - |
03/31/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Partial Approval | Entered by RSALDAT1 - PARTIAL AT THIS TIME FOR THE WESTERN PORTION OF THE SITE. |
02/17/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Controls installed along temporary perimeter fencing, west side of site along river path. David with BFL. |
02/09/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by VLEON1 - Partially approved. David with Bfl. 600 feet of waddle staked and overlapped. Cut and berm where discussed and track out protection in place. |
01/22/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by VLEON1 - PARTIAL WADDLES INSTALLED AS DISCUSSED |