Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Copy of notice of intent Requested from general contractor |
| 02/10/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Obtained SWPPP information from job site signage |
| 08/05/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued Contractor making preparations to start utility work. |
| 07/29/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. V ditch cut along inside site perimeter to catch any silt or debris.
|
| 07/08/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Controls needed along north property line due to newly installed materials. Grading in that location in progress. |
| 06/25/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by VLEON1 - |
| 05/26/2021 |
SITE - Stormwater Setup and Controls |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - RI canceled |
| 05/03/2021 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - MINOR CHANGE TO CONTROLS MADE ON THIS DATE |
| 04/15/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by VLEON1 - |
| 03/31/2021 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Partial Approval |
Entered by RSALDAT1 - PARTIAL AT THIS TIME FOR THE WESTERN PORTION OF THE SITE. |
| 02/17/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Controls installed along temporary perimeter fencing, west side of site along river path. David with BFL. |
| 02/09/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by VLEON1 - Partially approved. David with Bfl. 600 feet of waddle staked and overlapped. Cut and berm where discussed and track out protection in place. |
| 01/22/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by VLEON1 - PARTIAL WADDLES INSTALLED AS DISCUSSED |