Permit: DP20-0117
Permit Details
Status:
Complete
Type:
Development Package
Address:
1328 E HEDRICK DR
Address NEW:
1328 E HEDRICK DR
Apply Date:
06/01/2020
Applicant:
Larry Olson
Description:
SITE/GRADING/FUP - Hedrick Flats, 8-unit apartment complex.
Permit Reviews
Permit Number - DP20-0117
Permit Status: Complete
Permit Description: SITE/GRADING/FUP - Hedrick Flats, 8-unit apartment complex.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2020 | DEV PKG - OK TO SUBMIT | 06/02/2020 | COMPLETED |
| 06/02/2020 | DEV PKG | 07/03/2020 | COMPLETED |
| 07/24/2020 | DEV PKG - RESUBMITTAL | 08/28/2020 | COMPLETED |
| 09/03/2020 | DEV PKG - RESUBMITTAL | 09/18/2020 | COMPLETED |
| 09/22/2020 | DEV PKG - RESUBMITTAL | 09/22/2020 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0117
Permit Description: SITE/GRADING/FUP - Hedrick Flats, 8-unit apartment complex.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - approval} ; {Activity date: 11/04/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued, minor track-out noted. Work within the right of way in progress.} ; {Activity date: 10/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Track out noted.} ; {Activity date: 09/30/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continue. Site is muddy but no track out on Hedrick. No activity on site at this time. } ; {Activity date: 09/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues or concerns.} ; {Activity date: 08/25/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 07/29/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. There is mud track out on Hedrick.} |
|
| 12/08/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - approval} ; {Activity date: 08/25/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue} ; {Activity date: 07/29/2021; Status: Denied; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Denied. There is no track out protection in place. Lot is muddy.} | |
| 12/08/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - approval} ; {Activity date: 08/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. 9 AM preconstruction meeting. Eight unit apartment complex. Less than 1 acre Buildings have been constructed. Contractor getting ready to start parking lot and trash enclosure areas Larry , Robin 358-8075, with Hartman construction, Oracle engineering. Shiloh w strunk , Steve Bohn, Architect, landscape architect on site. Inspector expresses concern with saguaro location close to building. Next inspection, trash enclosure footings. Curbs and sidewalks, and product is what matters. Do not exceed 2% per slope. Install accessible signs in footings for detail. Ensure proper of water harvesting areas, suggest over excavation. Contact right away Inspector for work outside of property line. } ; {Activity date: 08/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. 9 AM preconstruction meeting.} ; {Activity date: 06/29/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN / GAVE THE CONTRACTOR A COPY OF THE TRASH BINS DETAILS AND INFORMED THEM TO SCHEDULE INSPECTION EVERY TWO WEEKS .INFORMED THEM ABOUT THE HANDICAP PARKING AREA NEED TO BE 2 %.} |
|
| 12/09/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved} | |
| 12/10/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved landscaping} | |
| 12/14/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Partially approved. Saguaro cactus installed. Concerned with proximity to home. Need to check plans for location. Please provide contact information when scheduling inspections. Contractor unavailable.} |
|
| 12/28/2021 | ENGR Engineering Final | Passed | {Activity date: 12/28/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 12/28/2021 | ENGR Grading Final | Passed | {Activity date: 12/28/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 12/28/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 12/28/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/08/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - Partially approved. Inspection is actually for monument sign permit T210T00509. Larry at 429-2907} ; {Activity date: 09/14/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Robin the general contractor is requesting inspection of monument sign. He will provide the appropriate permit number for the sign and results will be entered under the appropriate permit. Contractor given a verbal OK to continue.} |