Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/02/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved. Trash enclosure slab and bollards. Gabe with Hartman construction 975-9380 |
| 09/23/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Pre-grout. Robin |
| 09/21/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Robin, schedule Pre-grout inspection when ready
Schedule for both trash enclosure and monument sign under each permit as required
|
| 09/17/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - . Par. Trash enclosure footings. |
| 09/13/2021 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by RSALDAT1 - CN/ FOOTER INSPECTION GOOD AT IS TIME. |
| 12/15/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved |
| 12/01/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Paving
|
| 11/17/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. A.B. installation for asphalt
|
| 11/16/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - . Partial approval. Monument sign footing. Robin will provide sign permit number and photo documentation |
| 11/03/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - . Partially approved. Trash enclosure slab |
| 10/27/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. No new activity since last inspection. |
| 10/20/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - . Continued. Concrete contractor with questions concerning the right of way. Directed to call in for right of way inspections and contact his department of transportation Inspector |
| 10/13/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Contractor installing water utility |
| 10/08/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by VVERA1 - Partially approved. Curbs have been installed |
| 09/17/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - . Continued. Verify acceptance of changes through designer. Provide as built for elevation discrepancies. Only concern is flooding at lower building. Meeting with Builder and concrete contractor. |
| 09/07/2021 |
ENGR Grading Final |
ESTEVENS |
Continued |
Entered by RSALDAT1 - Continued. Robin, have designer contact plan review regarding potential changes and requirements.
|
| 08/25/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Rough grading. Buildings constructed. |
| 07/29/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Lot has been rough graded, perimeter block wall construction in progress, building construction at rear of lot. Material stock piles and debris on site. Site is muddy. Contractor unavailable.
Please provide a contact name and number on scheduling inspections. Please schedule all required inspections.
|
| 12/28/2021 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 12/28/2021 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |