Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/08/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by VVERA1 - approval |
| 08/25/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. 9 AM preconstruction meeting. Eight unit apartment complex. Less than 1 acre Buildings have been constructed. Contractor getting ready to start parking lot and trash enclosure areas
Larry , Robin 358-8075, with Hartman construction, Oracle engineering.
Shiloh w strunk , Steve Bohn, Architect, landscape architect on site.
Inspector expresses concern with saguaro location close to building.
Next inspection, trash enclosure footings. Curbs and sidewalks, and product is what matters. Do not exceed 2% per slope. Install accessible signs in footings for detail. Ensure proper of water harvesting areas, suggest over excavation. Contact right away Inspector for work outside of property line.
|
| 08/25/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. 9 AM preconstruction meeting. |
| 06/29/2021 |
PDSD Engineering Division Pre-Construction SITE |
MHERNANDEZ |
Continued |
Entered by VLEON1 - CN / GAVE THE CONTRACTOR A COPY OF THE TRASH BINS DETAILS AND INFORMED THEM TO SCHEDULE INSPECTION EVERY TWO WEEKS .INFORMED THEM ABOUT THE HANDICAP PARKING AREA NEED TO BE 2 %. |