Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
04/07/2020
Applicant:
Description:
SITE/GRADING/SWPPP - Woodspring Suites at Tucson Marketplace.

Permit Reviews

Permit Number - DP20-0073
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Woodspring Suites at Tucson Marketplace.
Start Date Submittal Complete Date Status  
03/02/2020 DEV PKG - OK TO SUBMIT 04/10/2020 COMPLETED Review Details
04/10/2020 DEV PKG 05/19/2020 COMPLETED Review Details
06/11/2021 DEV PKG - OK TO SUBMIT 06/15/2021 COMPLETED Review Details
06/15/2021 REVISION - - 1ST 06/15/2021 COMPLETED Review Details
07/22/2020 DEV PKG - RESUBMITTAL 08/25/2020 COMPLETED Review Details
07/29/2021 REVISION - - 1ST 08/25/2021 COMPLETED Review Details
09/06/2021 REVISION - - 1ST 10/11/2021 COMPLETED Review Details
09/10/2020 DEV PKG - RESUBMITTAL 09/14/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0073
Permit Description: SITE/GRADING/SWPPP - Woodspring Suites at Tucson Marketplace.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/03/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - 9180 (LANDSCAPE INSPECTION) IS APPROVED} ; {Activity date: 02/02/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 1420 E TUCSON MARKETPLACE BL TRASH BIN FOOTER}
09/07/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 09/07/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150. 09152. Approved.} ; {Activity date: 09/07/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150. 09152. Approved.} ; {Activity date: 11/19/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. Track out protection installed at new site entrance.} ; {Activity date: 11/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.} ; {Activity date: 10/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Concrete containment} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Mike with Chase builders will install the remainder of the bottles after the excess stock pile of dirt has been removed. Signage is being fabricated and will be installed next week.

} ; {Activity date: 09/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.} ; {Activity date: 09/30/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Waddle at the northwest southwest corners of the site has been installed. Perimeter fencing has been installed. No signage has yet been installed. Please post address. Please post SWPPP permit.} ; {Activity date: 09/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved waddle at Northwest portion of site} ; {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Contractor installing controls.

} ; {Activity date: 09/22/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Contractor will be installing side fencing and stormwater controls later this week. And inspection has been scheduled for next Wednesday. Mike with Chase builders

}
09/07/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/07/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150. 09152. Approved.} ; {Activity date: 09/07/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150. 09152. Approved.} ; {Activity date: 09/22/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Teleconference preconstruction meeting with John Vanwinkle and Dave along with Mike 390-5542 from Chase builders, Ben Z, Scott Krauss engineer from DPSGroup project p.m. Geoff Dupree, Francis Hannah, Ron Barnett owners rep, Bob Harrison.} ; {Activity date: 09/16/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Mike with Chase builders at390-5542. No activity on site at this time.
New hotel next to Dave & Buster’s. Planning to break ground next week.
Please reschedule preconstruction meeting along with inspection for stormwater controls after installing. Post address and SWPPP permit as required.

} ; {Activity date: 09/16/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Teleconference preconstruction meeting with John Vanwinkle and Dave along with Mike 390-5542 from Chase builders, Ben Z, Scott Krauss engineer from DPSGroup project p.m. Geoff Dupree, Francis Hannah, Ron Barnett owners rep, Bob Harrison. Letter of substantial conformance will be required at project completion}
09/09/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/09/2021; Status: Approved; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - APPROVED
1420 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Approved; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - APPROVED
1590 E TUCSON MARKETPLACE BL} ; {Activity date: 09/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/09/2021 ENGR Grading Final Passed {Activity date: 09/09/2021; Status: Approved; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - APPROVED
1420 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Approved; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - APPROVED 1590 E TUCSON MARKETPLACE BL} ; {Activity date: 09/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/11/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - 9185 (GRADING - INTERMEDIATE) CN /GRADING THE PARKING LOT.} ; {Activity date: 06/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - NA} ; {Activity date: 06/11/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 1590 E TUCSON MARKETPLACE BL, LOOKING AT THE TRASH ENCLOSURE FLOOR. I HAVE ASKED THE CONTRACTOR TO PROVIDE ADDITIONAL CHAIRS UNDER THE REBAR MAT AND SEND ME A PICTURE ONCE IT IS READY TO POUR.} ; {Activity date: 06/11/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 1420 E TUCSON MARKETPLACE BL, LOOKING AT THE TRASH ENCLOSURE FLOOR. I HAVE ASKED THE CONTRACTOR TO PROVIDE ADDITIONAL CHAIRS UNDER THE REBAR MAT AND SEND ME A PICTURE ONCE IT IS READY TO POUR.} ; {Activity date: 01/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 1420 E TUSON MARKETPLACE BL REBAR NOT READY RE-INSPECTION TOMORROW. WATTLES NEED TO BE MAINTENANCE} ; {Activity date: 01/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CANCELLED NO ONE ON SITE BEACUES OF RAIN LAST NIGHT} ; {Activity date: 01/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - FOR 1590 E TUCSON MARKETPLACE BL - CONTINUED AT THIS TIME, NO CONTACT INFORMATION HAS BEEN PROVIDED FOR THIS INSPECTION.

} ; {Activity date: 01/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONTACT INFORMATION HAS BEEN PROVIDED FOR THIS INSPECTION.

} ; {Activity date: 11/19/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved, Catch basin rebar.} ; {Activity date: 11/13/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by PAHUMAD1 - Partially approved.} ; {Activity date: 11/06/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Shading and backfilling 24 inch storm drain} ; {Activity date: 11/05/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. 24 inch storm drain piping. Mike with Chase builders} ; {Activity date: 11/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Excavation continuing for 24 inch storm drain} ; {Activity date: 11/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Shading and bedding with completion of 48 inch storm drain piping.} ; {Activity date: 10/30/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. 48 inch storm drain from connection to existing onto site. Mike with Chase builders.} ; {Activity date: 10/30/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. 48 inch storm drain from connection to existing onto site. Mike with Chase builders.} ; {Activity date: 10/29/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - MET THE CONTRACTOR AND WITNESSED THE FOLLOWING, 48” PIPE INSTALLED AND BACK FILLED FROM 0 00 TO STATION 0 75, INSTALLING AND BACKFILLING PIPE FROM STATION 0 75 TO STATION 1 25. COLLAR TO BE POURED AT STATION 0 00 AT A LATER DATE, WILL NEED TO VERIFY COLLAR SPECS PRIOR TO CONCRETE PLACEMENT.} ; {Activity date: 10/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Excavating for stormwater pipe. Mike with Chase builders will document the installation with pictures and call for daily inspections. OK to cover with daily progress. Inspector needs to see Our connections, piping and bedding and catch basins and manholes.} ; {Activity date: 10/27/2020; Status: Continued; Inspector: BBRENEDON; Comment: Entered by PAHUMAD1 - Continued. Rough grading has been completed and footings have been poured. Material stock piles on site} ; {Activity date: 10/20/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Over excavation and backfill completed contractor starting building footings.} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Excavation and material hauling from site in progress.

} ; {Activity date: 10/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Rough grading has started} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Existing material removal and rough grading to start}
09/09/2021 COT - ENGR - Signage Final Passed {Activity date: 09/09/2021; Status: Approved; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - APPROVED
1420 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Approved; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - APPROVED
1590 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. Mike with Chase builders. Intermediate and rebar inspections, and several other inspections and permit card have not yet been approved. Please schedule all remaining required inspections from development package permit. Provide termination of SWPPP permit and remove all temporary Stormwater controls.

} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. No contact information provided. Attempted to call Mike with Chase builders mailbox was full. Intermediate and rebar inspections have not yet been approved. Please schedule all remaining required inspections from development package permit and building permit and please provide contact information.

} ; {Activity date: 09/03/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VVERA1 - 9030 (SIGN - FINAL) IS NOT READY,THIS INSPECTION CAN BE APPROVED ONCE THE BUILDING ADDRESS IS INSTALLED
}
12/15/2021 SITE - Stormwater Follow-up Passed {Activity date: 12/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - PARTIAL
1420 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - PARTIAL
1590 E TUCSON MARKETPLACE BL} ; {Activity date: 09/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - NA} ; {Activity date: 12/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Minor track out at unprotected entrance to the west. Main entrance protected} ; {Activity date: 11/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continue. Note, large material piles on site} ; {Activity date: 11/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Mike with Chase builders has been asked to keep the streets clean.

} ; {Activity date: 11/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor trackout noted.} ; {Activity date: 10/27/2020; Status: Continued; Inspector: BBRENEDON; Comment: Entered by PAHUMAD1 - Continued. No issues at this time. Material stock piles on and around site. Contained within undeveloped area

} ; {Activity date: 10/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued.} ; {Activity date: 10/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues or concerns at this time} ; {Activity date: 09/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.}
12/15/2021 SITE - Stormwater Final Inspection Passed {Activity date: 12/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - PARTIAL DOWN SPOUT NEED TO REINSPECTED
1420 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - DOWN SPOUT NEED TO REINSPECTED
1590 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. Mike with Chase builders. Intermediate and rebar inspections, and several other inspections and permit card have not yet been approved. Please schedule all remaining required inspections from development package permit. Provide termination of SWPPP permit and remove all temporary Stormwater controls.

} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. No contact information provided. Attempted to call Mike with Chase builders mailbox was full. Intermediate and rebar inspections have not yet been approved. Please schedule all remaining required inspections from development package permit and building permit and please provide contact information.

} ; {Activity date: 09/03/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VVERA1 - 9160 (STORMWATER FINAL INSPECTION) NOT READY, PROVIDE US WITH A COPY OF THE NOTICE OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THE SWPPP.}
12/16/2021 ENGR Engineering Final Passed {Activity date: 12/16/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: LBOWERS; Comment: Entered by LBOWERS1 - REVISION 1 FOR BIKE RACKS STILL PENDING. APPROVALS REMOVED UNTIL REVISION IS APPROVED AND INSPECTED.} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - PARTIAL
1420 E TUCSON MARKETPLACE BL} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - PARTIAL
1590 E TUCSON MARKETPLACE BL} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. Mike with Chase builders. Intermediate and rebar inspections, and several other inspections and permit card have not yet been approved. Please schedule all remaining required inspections from development package permit. Provide termination of SWPPP permit and remove all temporary Stormwater controls.

} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. No contact information provided. Attempted to call Mike with Chase builders mailbox was full. Intermediate and rebar inspections have not yet been approved. Please schedule all remaining required inspections from development package permit and building permit and please provide contact information.

} ; {Activity date: 09/03/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - PA} ; {Activity date: 09/22/2020; Status: Prior to Final Inspectn; Inspector: JV; Comment: Entered by JVWINKL1 - EOR Substantial conformance letter required prior to final}

Documents

File Name Document Type  
REV-1_3_2021-0901-19-0528-WOODSPRING SUITES, DEV PKG.PDF PLANS UNDER REVIEW VIEW
REV-1_3_ONLINE SUBMITTAL PAGE, RECVD 09.02.21.PDF PLANS UNDER REVIEW VIEW
REV-1_3_COMMENT RESPONSE LETTER.PDF PLANS UNDER REVIEW VIEW
REV-1_2_ONLINE SUBMITTAL PAGE, RECVD 07.29.21.PDF PLANS UNDER REVIEW VIEW
REV-1_2_WOODSPRINGS DEVELOPMENT PACKAGE.PDF PLANS UNDER REVIEW VIEW
REV-1_ONLINE SUBMITTAL PAGE, RECVD 06.09.21.PDF PLANS UNDER REVIEW VIEW
REV-1_ REVISION LETTER, BIKE LOCKERS.PDF PLANS UNDER REVIEW VIEW
PERMIT.PDF DOCUMENTS VIEW
1-27 OF 27.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
TAA AVIGATION EASEMENT-TUS RRG9.2.2020.PDF DOCUMENTS VIEW
COMMENT RESP SPREADSHEET, 09.10.20.PDF DOCUMENTS VIEW
FAA_FORM_7460-1.PDF DOCUMENTS VIEW
FINAL DRAINAGE REPORT.PDF DOCUMENTS VIEW
LANDSCAPE PROJECT SPECIFICATIONS.PDF DOCUMENTS VIEW
LD SHARED ACCESS ESMT 1 V2.PDF DOCUMENTS VIEW
LD SHARED ACCESS ESMT 2 V2.PDF DOCUMENTS VIEW
LD WLE 1 V2 2020-08-13.PDF DOCUMENTS VIEW
LD WLE 2 2020-06-12.PDF DOCUMENTS VIEW
LD WLE 3 2020-09-09.PDF DOCUEMNTS VIEW
LEGAL DESCRIPTION.PDF DOCUMENTS VIEW
USGS 7.5MINUTE MAP WDSPNG SUITES REDUCED.PDF DOCUMENTS VIEW
COMMENT RESPONSE, 07.22.20.PDF DOCUMENTS VIEW
SWPPP REPORT.PDF DOCUMENTS VIEW
SEWER REPORT.PDF DOCUMENTS VIEW
TUCSON AIRPORT AUTHORITY, REVIEW LETTER, 05.04.2020.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRC MINUTES.01-07-20.PDF DOCUMENTS VIEW
DRC APPROVED LS PLAN.PDF DOCUMENTS VIEW
GEOTECH FINAL RPT_WOODSPRING SUITES_SEALED.PDF DOCUMENTS VIEW
SEWER REPORT.PDF DOCUMENTS VIEW
NPPO APP.PDF DOCUMENTS VIEW