Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP20-0073
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/03/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
11/03/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by PAHUMAD1 - Continued work on storm drain piping and systems |
09/29/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Temporary fence and stormwater protections have been installed. There’s no activity on the side of the street |
09/15/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Mike with Chase builders @ 390-5542 plans to start hotel project next week if possible. Permit is in approved status. Please schedule a 09150 Preconstruction meeting inspection when ready. |
09/09/2021 | ENGR Grading Final | MHERENANDEZ | Approved | Entered by NGARCIA3 - APPROVED 1420 E TUCSON MARKETPLACE BL |
09/03/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
04/09/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - 1590 CONTINUED AT THIS TIME, INSPECTION SCHEDULED FOR TODAY IS FOR LIGHT POLE FOUNDATIONS, THESE ARE TO BE INSPECTED BY THE BUILDING INSPECTOR UNDER THE COMBO PERMIT. THIS INSPECTION HAS BEEN PERFORMED BY DAVID MUNIZ. |
04/09/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - 1420 CONTINUED AT THIS TIME, INSPECTION SCHEDULED FOR TODAY IS FOR LIGHT POLE FOUNDATIONS, THESE ARE TO BE INSPECTED BY THE BUILDING INSPECTOR UNDER THE COMBO PERMIT. THIS INSPECTION HAS BEEN PERFORMED BY DAVID MUNIZ. |
04/07/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1590 E TUCSON MARKETPLACE BL - FIVE LIGHT POLE FOUNDATION ARE GOOD .CONTRACTOR WILL SEND ME APHOTO OF THE OTHER TWO FOUNDATION. |
04/07/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1420 E TUCSON MARKETPLACE BL - FIVE LIGHT POLE FOUNDATION ARE GOOD .CONTRACTOR WILL SEND ME APHOTO OF THE OTHER TWO FOUNDATION. |
03/16/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 1590 E TUCSON MARKETPLACE BL - GRO\UTES THE LAST TWO FOOT AND THE BOND BEAM FOR THE TRASH BIN .TOOK SOME PHOTO . THE SMALL WALL WAS GROUTED TOO AND HAVE PHOTO OF IT |
03/16/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1420 E TUCSON MARKETPLACE BL - GRO\UTES THE LAST TWO FOOT AND THE BOND BEAM FOR THE TRASH BIN .TOOK SOME PHOTO . THE SMALL WALL WAS GROUTED TOO AND HAVE PHOTO OF IT |
03/15/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1590 E TUCSON MARKETPLACE BL. NOT RREADY FOR INSPECTION YET RESCHEDULE FOR TOMORROW AT 11:00 AM. |
03/15/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1420 E TUCSON MARKETPLACE BL . NOT RREADY FOR INSPECTION YET RESCHEDULE FOR TOMORROW AT 11:00 AM. |
03/12/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 1590 E TUCSON MARKETPLACE BLVD - OK TO GROUT THE FIRST 4 FEET OF THE WALLS AT THIS TIME |
03/12/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 1420 E TUCSON MARKETPLACE BLVD - PARTIAL, OK TO GROUT THE FIRST 4 FEET OF THE WALLS AT THIS TIME |
02/04/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE, POURING FOOTER FOR TRASH BIN |
02/03/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1590 E TUCSON MARKETPLACE BL POURING FOOTER FOR TRASH BIN |
02/03/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1420 E TUCSON MARKETPLACE BL POURING FOOTER FOR TRASH BIN |
02/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - 1590 E TUCSON MARKET PLACE |
02/01/2021 | ENGR Grading Final | MHERNANDEZ | Denied | Entered by VLEON1 - DENIED FOR 1590 E TUCSON MARKETPLACE BL BOLLARDS LAYOUT NOT CORRECT RESCHEDULE FOR TOMORROW |
02/01/2021 | ENGR Grading Final | MHERNANDEZ | Denied | Entered by VLEON1 - DENIED FOR 1420 E TUCSON MARKETPLAC BL BOLLARDS LAYOUT NOT CORRECT RESCHEDULE FOR TOMORROW |
12/15/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Trash enclosure detail provided to Mike |
11/19/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - Partially approved, Catch basin rebar. |
11/19/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - Partially approved, Catch basin rebar. |
11/13/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - . Partially approved. Catch basin per detail PAG 309 |
09/09/2021 | ENGR Grading Final | MHERENANDEZ | Approved | Entered by NGARCIA3 - APPROVED 1420 E TUCSON MARKETPLACE BL |
09/09/2021 | ENGR Grading Final | MHERENANDEZ | Approved | Entered by NGARCIA3 - APPROVED 1590 E TUCSON MARKETPLACE BL |
09/03/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/11/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - 9185 (GRADING - INTERMEDIATE) CN /GRADING THE PARKING LOT. |
06/16/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - NA |
06/11/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 1590 E TUCSON MARKETPLACE BL, LOOKING AT THE TRASH ENCLOSURE FLOOR. I HAVE ASKED THE CONTRACTOR TO PROVIDE ADDITIONAL CHAIRS UNDER THE REBAR MAT AND SEND ME A PICTURE ONCE IT IS READY TO POUR. |
06/11/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 1420 E TUCSON MARKETPLACE BL, LOOKING AT THE TRASH ENCLOSURE FLOOR. I HAVE ASKED THE CONTRACTOR TO PROVIDE ADDITIONAL CHAIRS UNDER THE REBAR MAT AND SEND ME A PICTURE ONCE IT IS READY TO POUR. |
01/25/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 1420 E TUSON MARKETPLACE BL REBAR NOT READY RE-INSPECTION TOMORROW. WATTLES NEED TO BE MAINTENANCE |
01/25/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CANCELLED NO ONE ON SITE BEACUES OF RAIN LAST NIGHT |
01/08/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - FOR 1590 E TUCSON MARKETPLACE BL - CONTINUED AT THIS TIME, NO CONTACT INFORMATION HAS BEEN PROVIDED FOR THIS INSPECTION. |
01/08/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONTACT INFORMATION HAS BEEN PROVIDED FOR THIS INSPECTION. |
11/19/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - Partially approved, Catch basin rebar. |
11/13/2020 | ENGR Grading Final | WGALLAGHER | Partial Approval | Entered by PAHUMAD1 - Partially approved. |
11/06/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Shading and backfilling 24 inch storm drain |
11/05/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - Partially approved. 24 inch storm drain piping. Mike with Chase builders |
11/04/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by PAHUMAD1 - Continued. Excavation continuing for 24 inch storm drain |
11/03/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by PAHUMAD1 - Continued. Shading and bedding with completion of 48 inch storm drain piping. |
10/30/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - Partially approved. 48 inch storm drain from connection to existing onto site. Mike with Chase builders. |
10/30/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. 48 inch storm drain from connection to existing onto site. Mike with Chase builders. |
10/29/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - MET THE CONTRACTOR AND WITNESSED THE FOLLOWING, 48” PIPE INSTALLED AND BACK FILLED FROM 0 00 TO STATION 0 75, INSTALLING AND BACKFILLING PIPE FROM STATION 0 75 TO STATION 1 25. COLLAR TO BE POURED AT STATION 0 00 AT A LATER DATE, WILL NEED TO VERIFY COLLAR SPECS PRIOR TO CONCRETE PLACEMENT. |
10/28/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continue. Excavating for stormwater pipe. Mike with Chase builders will document the installation with pictures and call for daily inspections. OK to cover with daily progress. Inspector needs to see Our connections, piping and bedding and catch basins and manholes. |
10/27/2020 | ENGR Grading Final | BBRENEDON | Continued | Entered by PAHUMAD1 - Continued. Rough grading has been completed and footings have been poured. Material stock piles on site |
10/20/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Over excavation and backfill completed contractor starting building footings. |
10/08/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Excavation and material hauling from site in progress. |
10/06/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Rough grading has started |
10/02/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Existing material removal and rough grading to start |