Permit: DP20-0073

Parcel: 13213099A

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP20-0073

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
09/09/2021 ENGR Engineering Final MHERENANDEZ Approved Entered by NGARCIA3 - APPROVED 1420 E TUCSON MARKETPLACE BL
09/09/2021 ENGR Engineering Final MHERENANDEZ Approved Entered by NGARCIA3 - APPROVED 1590 E TUCSON MARKETPLACE BL
09/09/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
09/03/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
09/03/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
09/07/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. Mike with Chase builders. Intermediate and rebar inspections, and several other inspections and permit card have not yet been approved. Please schedule all remaining required inspections from development package permit. Provide termination of SWPPP permit and remove all temporary Stormwater controls.
09/07/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. No contact information provided. Attempted to call Mike with Chase builders mailbox was full. Intermediate and rebar inspections have not yet been approved. Please schedule all remaining required inspections from development package permit and building permit and please provide contact information.
09/03/2021 ENGR Engineering Final DROBERTS Continued Entered by VVERA1 - 9190 (GRADING - FINAL) IS CONTINUED AT THIS TIME, COMPLETE ALL THE WORK AROUND THIS SITE AND ALL OTHER INSPECTIONS FOR THIS PERMIT PRIOR TO RESCHEDULING THE FINAL GRADING INSPECTION.
12/16/2021 ENGR Engineering Final DROBERTS Approved Entered by VVERA1 - IS APPROVED
09/09/2021 ENGR Engineering Final LBOWERS Partial Approval Entered by LBOWERS1 - REVISION 1 FOR BIKE RACKS STILL PENDING. APPROVALS REMOVED UNTIL REVISION IS APPROVED AND INSPECTED.
09/09/2021 ENGR Engineering Final MHERENANDEZ Partial Approval Entered by NGARCIA3 - PARTIAL 1420 E TUCSON MARKETPLACE BL
09/09/2021 ENGR Engineering Final MHERENANDEZ Partial Approval Entered by NGARCIA3 - PARTIAL 1590 E TUCSON MARKETPLACE BL
09/07/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. Mike with Chase builders. Intermediate and rebar inspections, and several other inspections and permit card have not yet been approved. Please schedule all remaining required inspections from development package permit. Provide termination of SWPPP permit and remove all temporary Stormwater controls.
09/07/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 09027, 09030, 09160, 09190. Not ready. No contact information provided. Attempted to call Mike with Chase builders mailbox was full. Intermediate and rebar inspections have not yet been approved. Please schedule all remaining required inspections from development package permit and building permit and please provide contact information.
09/03/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by VVERA1 - PA
09/22/2020 ENGR Engineering Final JV Prior to Final Inspectn Entered by JVWINKL1 - EOR Substantial conformance letter required prior to final