Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/07/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - 09150. 09152. Approved. |
| 09/07/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - 09150. 09152. Approved. |
| 09/22/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Teleconference preconstruction meeting with John Vanwinkle and Dave along with Mike 390-5542 from Chase builders, Ben Z, Scott Krauss engineer from DPSGroup project p.m. Geoff Dupree, Francis Hannah, Ron Barnett owners rep, Bob Harrison. |
| 09/16/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by JSCHNEI2 - Partially approved. Mike with Chase builders at390-5542. No activity on site at this time.
New hotel next to Dave & Buster’s. Planning to break ground next week.
Please reschedule preconstruction meeting along with inspection for stormwater controls after installing. Post address and SWPPP permit as required.
|
| 09/16/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by JSCHNEI2 - Partially approved. Teleconference preconstruction meeting with John Vanwinkle and Dave along with Mike 390-5542 from Chase builders, Ben Z, Scott Krauss engineer from DPSGroup project p.m. Geoff Dupree, Francis Hannah, Ron Barnett owners rep, Bob Harrison. Letter of substantial conformance will be required at project completion |