Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
910 W STARR PASS BL
Apply Date:
10/18/2019
Applicant:
Description:
SITE/GRADING - 910 W. Starr Pass Blvd, Eight SFR rental units.

Permit Reviews

Permit Number - DP19-0257
Permit Status: Complete
Permit Description: SITE/GRADING - 910 W. Starr Pass Blvd, Eight SFR rental units.
Start Date Submittal Complete Date Status  
01/23/2020 DEV PKG - RESUBMITTAL 01/30/2020 COMPLETED Review Details
02/03/2022 DEV PKG - OK TO SUBMIT 02/07/2022 COMPLETED Review Details
02/23/2022 DEV PKG - OK TO SUBMIT 03/10/2022 COMPLETED Review Details
03/10/2022 REVISION - - 1ST 04/07/2022 COMPLETED Review Details
04/15/2022 REVISION - - 1ST 05/11/2022 COMPLETED Review Details
09/19/2019 DEV PKG - OK TO SUBMIT 10/22/2019 COMPLETED Review Details
10/22/2019 DEV PKG 11/26/2019 COMPLETED Review Details
12/17/2019 DEV PKG - RESUBMITTAL 01/23/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0257
Permit Description: SITE/GRADING - 910 W. Starr Pass Blvd, Eight SFR rental units.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/24/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/24/2021 SITE - Stormwater Follow-up Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/24/2021 SITE - Stormwater Final Inspection Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/24/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/24/2021 COT - ENGR - Signage Final Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
03/08/2022 SITE - Stormwater Setup and Controls Passed {Activity date: 03/08/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - No controls at Southeast corner of site. Minor track out noted material and debris piles within temporary fencing.} ; {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
07/06/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/06/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 03/08/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL, COMPLETE SITE AS SHOWN ON THE APPROVED REVISED DRAWINGS PRIOR TO RECALLING THIS INSPECTION.}
07/06/2022 ENGR Engineering Final Passed {Activity date: 07/06/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 03/08/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - PARTIAL, COMPLETE AS SHOWN ON THE APPROVED REVISED DRAWINGS PRIOR TO RECALLING THIS INSPECTION.

}
07/12/2022 ENGR Grading Final Passed {Activity date: 07/12/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
APPROVED DEVELOPMENT PACKAGE.PDF DOCUMENTS VIEW
LETTER OF INTENT FROM CONTRACTOR - 910 W STARR PASS BLVD.PDF DOCUMENTS VIEW
SITE GRADING PERMIT 910 W STARR PASS BLVD.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
ONLINE SUBMITTAL PAGE, RECVD 04.14.22.PDF DOCUMENTS VIEW
TSMR_NARRATIVE LETTER.PDF DOCUMENTS VIEW
RESPONSE_LETTER, 04.13.22.PDF DOCUMENTS VIEW
RESPONSE_LETTER FOR REVISION, 02.22.22.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 02.22.22.PDF DOCUMENTS VIEW
CARPORT LETTER TO COT, REVISION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
MODEL_PLAN.PDF DOCUMENTS VIEW
PRESUBMITTAL_COMMENTS.PDF DOCUMENTS VIEW
PIMACOADDRESSING REVIEW, 11.08.19.PDF DOCUMENTS VIEW
EPNG_COMMENTS.PDF DOCUMENTS VIEW
FAA_COMMUNICATION.PDF DOCUMENTS VIEW
GRS_LANDSCAPE_RESPONSE, 12.16.19.PDF DOCUMENTS VIEW
RESPONSE_LETTER, 12.16.19.PDF DOCUMENTS VIEW
2ND_REVIEW_RESPONSE_LETTER, 01.23.2020.PDF DOCUMENTS VIEW
ENCLOSURE_CONCEPT.PDF DOCUMENTS VIEW
ES_CORRESPONDENCE.PDF DOCUMENTS VIEW