Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Fees Due
Type:
Development Package
Address NEW:
1955 W VALENCIA RD
Apply Date:
02/14/2019
Applicant:
Description:
SITE/GRADING - Culver's Restaurant.

Permit Reviews

Permit Number - DP19-0040
Permit Status: Fees due
Permit Description: SITE/GRADING - Culver's Restaurant.
Start Date Submittal Complete Date Status  
01/16/2019 DEV PKG - OK TO SUBMIT 02/19/2019 COMPLETED Review Details
02/19/2019 DEV PKG 03/27/2019 COMPLETED Review Details
04/04/2019 DEV PKG - RESUBMITTAL 04/18/2019 COMPLETED Review Details
04/29/2019 DEV PKG - REVISION 04/29/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Fees Due
Permit Number: DP19-0040
Permit Description: SITE/GRADING - Culver's Restaurant.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/20/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - }
10/21/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with Lee About final inspections.
} ; {Activity date: 06/18/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Held open for information only. Lee at 702-540-3896 GC. Desert build. Site contractor A&S 219-4552 Noah. Engineer PS OMAS Regina 690-7840. Call for biweekly inspections. Keep the site contained. Site is less than 1 acre. Engineer will inspect trash enclosure, site grading and landscaping as well as ground coverings and bicycle parking and accessible parking and access.} ; {Activity date: 06/13/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I stopped into the site and scheduled and spoke with Lee it’s 702-540-3896 about scheduling for a preconstruction meeting and providing track out protection and about keeping the site contained in the street clean.}
10/22/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/22/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by KROBLES1 - } ; {Activity date: 06/13/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - one entrance has controls in place the entrance onto Hadley does not.}
10/25/2019 ENGR Grading Final Passed {Activity date: 10/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/25/2019 SITE - Stormwater Final Inspection Passed {Activity date: 10/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/25/2019 COT - ENGR - Signage Final Passed {Activity date: 10/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/22/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by KROBLES1 - Not ready. Walk the site with a general contractor and discussed requirements for temporary certificate and for completion of the project.}
10/30/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/29/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete DG installation. Complete tree staking. Install backflow assembly pad. Repair parking lot at grease interceptor. Trim out exterior clean out. Schedule inspection for both permits when ready.} ; {Activity date: 10/25/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy. Complete the Work shown on the development package permit, including parking stops, depressed landscape area near the dumpster, ground coverings.} ; {Activity date: 10/22/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by KROBLES1 - Not ready. Walk the site with a general contractor and discussed requirements for temporary certificate and for completion of the project.}
10/30/2019 ENGR Engineering Final Passed {Activity date: 10/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/29/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete DG installation. Complete tree staking. Install backflow assembly pad. Repair parking lot at grease interceptor. Trim out exterior clean out. Schedule inspection for both permits when ready.} ; {Activity date: 10/25/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy. Complete the Work shown on the development package permit, including parking stops, depressed landscape area near the dumpster, ground coverings.}
10/30/2019 SITE - Stormwater Follow-up Passed {Activity date: 10/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/22/2019; Status: Correction Required; Inspector: RLEDON; Comment: Entered by KROBLES1 - stormwater follow up inspection. Continue. Talk to Rex from Ashton over the phone about making repairs to waddle under drive over culver.

} ; {Activity date: 10/22/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by KROBLES1 - } ; {Activity date: 09/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor track out to be noted that both site entrances.} ; {Activity date: 09/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted contractor will have it cleaned up.} ; {Activity date: 09/03/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Contractor is sweeping the street at the unprotected entrance. Note the street floods in the right of way, not due to construction site conditions.} ; {Activity date: 06/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 06/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out on Hadley Road.
}