Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 09/09/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Pre-grout inspection, trash enclosure |
| 09/03/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Trash enclosure footing and bollards. |
| 10/23/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/25/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/25/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/22/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by KROBLES1 - Continue. Paving in progress. |
| 09/20/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Met with Lee on site regarding accessible path from the street to the building. Any ramp, that gains more than 6 inches requires handrails on both sides for accessibility requirements. The ramp may not exceed 2% cross slope .The landings may not exceed 2% in either direction. |
| 09/03/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Builder is running rain liters through the sidewalk to terminate in the parking lot. |
| 07/15/2019 |
ENGR Grading Final |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - RI canceled |
| 06/18/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Basin Has been re-graded. |