Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP19-0040
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/21/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - I spoke with Lee About final inspections. |
06/18/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by DMERANZ1 - Held open for information only. Lee at 702-540-3896 GC. Desert build. Site contractor A&S 219-4552 Noah. Engineer PS OMAS Regina 690-7840. Call for biweekly inspections. Keep the site contained. Site is less than 1 acre. Engineer will inspect trash enclosure, site grading and landscaping as well as ground coverings and bicycle parking and accessible parking and access. |
06/13/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Denied | Entered by DMERANZ1 - I stopped into the site and scheduled and spoke with Lee it’s 702-540-3896 about scheduling for a preconstruction meeting and providing track out protection and about keeping the site contained in the street clean. |