Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - I spoke with Lee About final inspections.
|
| 06/18/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Held open for information only. Lee at 702-540-3896 GC. Desert build. Site contractor A&S 219-4552 Noah. Engineer PS OMAS Regina 690-7840. Call for biweekly inspections. Keep the site contained. Site is less than 1 acre. Engineer will inspect trash enclosure, site grading and landscaping as well as ground coverings and bicycle parking and accessible parking and access. |
| 06/13/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Denied |
Entered by DMERANZ1 - I stopped into the site and scheduled and spoke with Lee it’s 702-540-3896 about scheduling for a preconstruction meeting and providing track out protection and about keeping the site contained in the street clean. |