Permit Details

Status:
In Revision
Type:
Development Package
Apply Date:
02/14/2019
Applicant:
Description:
SITE/GRADING - Culver's Restaurant.

Permit Reviews

Permit Number - DP19-0040
Permit Status: In revision
Permit Description: SITE/GRADING - Culver's Restaurant.
Start Date Submittal Complete Date Status  
01/16/2019 DEV PKG - OK TO SUBMIT 02/19/2019 COMPLETED Review Details
02/19/2019 DEV PKG 03/27/2019 COMPLETED Review Details
04/04/2019 DEV PKG - RESUBMITTAL 04/18/2019 COMPLETED Review Details
04/29/2019 DEV PKG - REVISION 04/29/2019 COMPLETED Review Details

Completed Inspections

Permit Status: In Revision
Permit Number: DP19-0040
Permit Description: SITE/GRADING - Culver's Restaurant.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/20/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - }
10/21/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with Lee About final inspections.
} ; {Activity date: 06/18/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Held open for information only. Lee at 702-540-3896 GC. Desert build. Site contractor A&S 219-4552 Noah. Engineer PS OMAS Regina 690-7840. Call for biweekly inspections. Keep the site contained. Site is less than 1 acre. Engineer will inspect trash enclosure, site grading and landscaping as well as ground coverings and bicycle parking and accessible parking and access.} ; {Activity date: 06/13/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I stopped into the site and scheduled and spoke with Lee it’s 702-540-3896 about scheduling for a preconstruction meeting and providing track out protection and about keeping the site contained in the street clean.}
10/22/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/22/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by KROBLES1 - } ; {Activity date: 06/13/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - one entrance has controls in place the entrance onto Hadley does not.}
10/25/2019 ENGR Grading Final Passed {Activity date: 10/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/25/2019 SITE - Stormwater Final Inspection Passed {Activity date: 10/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/25/2019 COT - ENGR - Signage Final Passed {Activity date: 10/25/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/22/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by KROBLES1 - Not ready. Walk the site with a general contractor and discussed requirements for temporary certificate and for completion of the project.}
10/30/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/29/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete DG installation. Complete tree staking. Install backflow assembly pad. Repair parking lot at grease interceptor. Trim out exterior clean out. Schedule inspection for both permits when ready.} ; {Activity date: 10/25/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy. Complete the Work shown on the development package permit, including parking stops, depressed landscape area near the dumpster, ground coverings.} ; {Activity date: 10/22/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by KROBLES1 - Not ready. Walk the site with a general contractor and discussed requirements for temporary certificate and for completion of the project.}
10/30/2019 ENGR Engineering Final Passed {Activity date: 10/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/29/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete DG installation. Complete tree staking. Install backflow assembly pad. Repair parking lot at grease interceptor. Trim out exterior clean out. Schedule inspection for both permits when ready.} ; {Activity date: 10/25/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy. Complete the Work shown on the development package permit, including parking stops, depressed landscape area near the dumpster, ground coverings.}
10/30/2019 SITE - Stormwater Follow-up Passed {Activity date: 10/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/22/2019; Status: Correction Required; Inspector: RLEDON; Comment: Entered by KROBLES1 - stormwater follow up inspection. Continue. Talk to Rex from Ashton over the phone about making repairs to waddle under drive over culver.

} ; {Activity date: 10/22/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by KROBLES1 - } ; {Activity date: 09/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor track out to be noted that both site entrances.} ; {Activity date: 09/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted contractor will have it cleaned up.} ; {Activity date: 09/03/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Contractor is sweeping the street at the unprotected entrance. Note the street floods in the right of way, not due to construction site conditions.} ; {Activity date: 06/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 06/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out on Hadley Road.
}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LOI.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE LETTER.PDF DOCUMENTS VIEW
GEOTECH ADDENDUM.PDF DOCUMENTS VIEW
REFERENCE ONLY_DRAINAGE ADDENDUM.PDF DOCUMENTS VIEW
REFERENCE ONLY_SWPPP.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 04.01.19.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
1-11 OF 11.PDF DEVELOPMENT PACKAGE VIEW