Permit: DP19-0034
Permit Details
Apply Date:
02/11/2019
Applicant:
Description:
SITE/GRADE/SWPPP - TEP Kino Substation.
Permit Reviews
Permit Number - DP19-0034
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - TEP Kino Substation.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/11/2019 | DEV PKG - OK TO SUBMIT | 02/13/2019 | COMPLETED |
02/13/2019 | DEV PKG | 03/26/2019 | COMPLETED |
04/10/2020 | DEV PKG - OK TO SUBMIT | 04/13/2020 | COMPLETED |
04/13/2020 | REVISION - - 2ND | 04/30/2020 | COMPLETED |
04/18/2019 | DEV PKG - RESUBMITTAL | 05/24/2019 | COMPLETED |
06/01/2020 | REVISION - - 2ND | 07/17/2020 | COMPLETED |
10/07/2019 | DEV PKG - OK TO SUBMIT | 11/08/2019 | COMPLETED |
11/08/2019 | DEV PKG - REVISION | 12/19/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0034
Permit Description: SITE/GRADE/SWPPP - TEP Kino Substation.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/05/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please install stormwater controls along perimeter fencing, correct track out protection and schedule inspections as needed at least Biweekly.} | |
12/05/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Luke with Granite construction. Please schedule inspections biweekly for stormwater and as needed for riprap and drainage installations.} | |
11/16/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Landscapers installing irrigation on South portion of the site. Stake trees properly as needed.} ; {Activity date: 01/23/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Double stake the trees.} | |
11/16/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
11/16/2020 | ENGR Engineering Final | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} | |
11/16/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} ; {Activity date: 09/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No activity on site at this time. No stabilization has been applied.} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Controls are still in place} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Controls are still in place} ; {Activity date: 01/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 01/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 01/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls are still in place no issues at this time} ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Provide containment as necessary.} ; {Activity date: 11/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues} ; {Activity date: 11/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please install stormwater controls along perimeter fencing, correct track out protection and schedule inspections as needed at least Biweekly.} | |
11/16/2020 | ENGR Grading Final | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
11/16/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} | |
11/16/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |