Permit Details

Status:
Complete
Type:
Development Package
Address:
1740 E 36TH ST
Apply Date:
02/11/2019
Applicant:
Description:
SITE/GRADE/SWPPP - TEP Kino Substation.

Permit Reviews

Permit Number - DP19-0034
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - TEP Kino Substation.
Start Date Submittal Complete Date Status  
01/11/2019 DEV PKG - OK TO SUBMIT 02/13/2019 COMPLETED Review Details
02/13/2019 DEV PKG 03/26/2019 COMPLETED Review Details
04/10/2020 DEV PKG - OK TO SUBMIT 04/13/2020 COMPLETED Review Details
04/13/2020 REVISION - - 2ND 04/30/2020 COMPLETED Review Details
04/18/2019 DEV PKG - RESUBMITTAL 05/24/2019 COMPLETED Review Details
06/01/2020 REVISION - - 2ND 07/17/2020 COMPLETED Review Details
10/07/2019 DEV PKG - OK TO SUBMIT 11/08/2019 COMPLETED Review Details
11/08/2019 DEV PKG - REVISION 12/19/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0034
Permit Description: SITE/GRADE/SWPPP - TEP Kino Substation.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/05/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please install stormwater controls along perimeter fencing, correct track out protection and schedule inspections as needed at least Biweekly.}
12/05/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Luke with Granite construction. Please schedule inspections biweekly for stormwater and as needed for riprap and drainage installations.}
11/16/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Landscapers installing irrigation on South portion of the site. Stake trees properly as needed.} ; {Activity date: 01/23/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Double stake the trees.}
11/16/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/16/2020 ENGR Engineering Final Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
11/16/2020 SITE - Stormwater Follow-up Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} ; {Activity date: 09/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No activity on site at this time. No stabilization has been applied.} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Controls are still in place} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Controls are still in place} ; {Activity date: 01/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 01/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 01/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls are still in place no issues at this time} ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Provide containment as necessary.} ; {Activity date: 11/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues} ; {Activity date: 11/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please install stormwater controls along perimeter fencing, correct track out protection and schedule inspections as needed at least Biweekly.}
11/16/2020 ENGR Grading Final Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/16/2020 SITE - Stormwater Final Inspection Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
11/16/2020 COT - ENGR - Signage Final Passed {Activity date: 11/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
REV-2_2_LANDSCAPE.PDF PLANS UNDER REVIEW VIEW
REV-2_2_RESPONSE LETTER, 05.29.2020.PDF PLANS UNDER REVIEW VIEW
REV-2_2_CIVIL.PDF PLANS UNDER REVIEW VIEW
REV-2_2_DRC SIGNAGE APPROVAL.TEP SUBSTATION.PDF PLANS UNDER REVIEW VIEW
REV-2_2_EASEMENT.PDF PLANS UNDER REVIEW VIEW
REV-2_DP19-0034_PLAN-SET.PDF PLANS UNDER REVIEW VIEW
REV-2_DP19-0034_JUSTIFICATIONLTR, 04.08.2020.PDF PLANS UNDER REVIEW VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE REPORT, JAN. 2019.PDF DOCUMENTS VIEW
GEOREPORT ASPHALT REC.PDF DOCUMENTS VIEW
GEOTECH ENGINEERING REPORT.PDF DOCUMENTS VIEW
KINO SUB DEED, RECORDED.PDF DOCUMENTS VIEW
ENVIRON RESOURCE REPORT.PDF DOCUMENTS VIEW
TRANSMITTAL SHEET, 02.14.2019.PDF DOCUMENTS VIEW
AVIGATION EASEMENT.PDF DOCUMENTS VIEW
COMMENT-RESPONSE LTR.PDF DOCUMENTS VIEW
INCREASE WSE CONSENT FROM PIMA CO EMAIL.PDF DOCUMENTS VIEW
LED BOLLARDS ALONG KINO PARKWAY EMAIL.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
TAA ACCEPTANCE EMAIL.PDF DOCUMENTS VIEW
UPDATED DRC APPROVAL LTR.PDF DOCUMENTS VIEW
DRC EMAIL, BRIDGESDESIGNREVIEW.PDF DOCUMENTS VIEW
REVISION 1 LTR, 10.30.19.PDF DOCUMENTS VIEW
1-27 OF 24.PDF DEVELOPMENT PACKAGE VIEW