Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0034
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by JSCHNEI2 - APPROVED AT THIS TIME |
07/07/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, REBAR HAS BEEN APPROVED FOR THE WALL/SIGN FOOTER THAT WILL BE POURED AT 9. |
07/06/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE CREWS ARE WORKING ON THE PLACEMENT OF THE REBAR IN THE FOOTERS AS SHOWN ON THE PLANS. I HAVE ASKED TH SUPERVISOR FOR GRANITE CONSTRUCTION TO PLACE ADDITIONAL REBAR AS NEEDED IN THE FOOTER WHERE IT WIDENS. HE WILL PROVIDE ME WITH PHOTOS OF THE FOOTER ONCE THEY HAVE COMPLETED THE PLACEMENT. THEY WILL BE PLACING THE CONCRETE TOMORROW MORNING FOR THE FOOTER ONLY. |
07/02/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED ATTHE FOOTER EXCAVATION FOR THE RETAINING WALLS/SIGN AT THE SOUTHEAST CORNER OF KINO BL AND 36th ST. REBAR WILL BE PLACED AND INSPECTED ON MONDAY 7/6/2020. |
12/18/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Granite construction is installing a toe down along east/dividing line of site and riparian area. |
12/05/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor installing toe down along southeastern Perimeter of basin. And riprap as shown on approved plan. |
11/16/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
11/16/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/17/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. No activity on site at this time. No stabilization has been applied. |
03/02/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by SFLORES2 - |
03/02/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by SFLORES2 - |
02/06/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Contractor is continuing to install block along east perimeter. Contractor is installing utilities on the north end of the site. |
02/06/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Contractor is continuing to install block along east perimeter. Contractor is installing utilities on the north end of the site. |
02/05/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor is moving dirt around within the site and work is ongoing at East perimeter fencing. |
01/29/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor installing perimeter wall at south and southeast corner. Landscaping at basin and south portion of site. |
01/23/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor installing perimeter fencing, landscaping, riprap and overflow pipe at basin. |
01/08/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor installing perimeter fencing and irrigation tubing south of the site. Grouted riprap has been installed along the eastern bank of the basin. |
12/18/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Granite construction is installing a toe down along east/dividing line of site and riparian area. |
12/05/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor installing toe down along southeastern Perimeter of basin. And riprap as shown on approved plan. |
11/01/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Two superintendence on site or unaware of scheduled inspection and did not know what it was called. Please call for a preconstruction meeting 9150, and please provide contact information when scheduling inspections. Thank you Brian |
11/01/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Two superintendence on site or unaware of scheduled inspection and did not know what it was called. Please call for a preconstruction meeting 9150, and please provide contact information when scheduling inspections. Thank you Brian |
11/16/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/24/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. It appears as though the work may have been completed. The site is locked. There’s no activity at this time. Waiting for contractor to schedule all required inspections. |
11/20/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Please install stormwater controls along perimeter fencing, correct track out protection and schedule inspections as needed at least Biweekly. |
11/19/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Granite construction, Tep Kino substation. |