Permit: DP19-0034

Parcel: 13213078B


Addresses:

1740 E 36TH ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP19-0034

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
07/14/2020 ENGR Grading Final DROBERTS Approved Entered by JSCHNEI2 - APPROVED AT THIS TIME
07/07/2020 ENGR Grading Final DROBERTS Partial Approval Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, REBAR HAS BEEN APPROVED FOR THE WALL/SIGN FOOTER THAT WILL BE POURED AT 9.
07/06/2020 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE WORKING ON THE PLACEMENT OF THE REBAR IN THE FOOTERS AS SHOWN ON THE PLANS. I HAVE ASKED TH SUPERVISOR FOR GRANITE CONSTRUCTION TO PLACE ADDITIONAL REBAR AS NEEDED IN THE FOOTER WHERE IT WIDENS. HE WILL PROVIDE ME WITH PHOTOS OF THE FOOTER ONCE THEY HAVE COMPLETED THE PLACEMENT. THEY WILL BE PLACING THE CONCRETE TOMORROW MORNING FOR THE FOOTER ONLY.
07/02/2020 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED ATTHE FOOTER EXCAVATION FOR THE RETAINING WALLS/SIGN AT THE SOUTHEAST CORNER OF KINO BL AND 36th ST. REBAR WILL BE PLACED AND INSPECTED ON MONDAY 7/6/2020.
12/18/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Granite construction is installing a toe down along east/dividing line of site and riparian area.
12/05/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor installing toe down along southeastern Perimeter of basin. And riprap as shown on approved plan.
11/16/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/16/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/17/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. No activity on site at this time. No stabilization has been applied.
03/02/2020 ENGR Grading Final BBENEDON Approved Entered by SFLORES2 -
03/02/2020 ENGR Grading Final BBENEDON Approved Entered by SFLORES2 -
02/06/2020 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Contractor is continuing to install block along east perimeter. Contractor is installing utilities on the north end of the site.
02/06/2020 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Contractor is continuing to install block along east perimeter. Contractor is installing utilities on the north end of the site.
02/05/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is moving dirt around within the site and work is ongoing at East perimeter fencing.
01/29/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor installing perimeter wall at south and southeast corner. Landscaping at basin and south portion of site.
01/23/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor installing perimeter fencing, landscaping, riprap and overflow pipe at basin.
01/08/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor installing perimeter fencing and irrigation tubing south of the site. Grouted riprap has been installed along the eastern bank of the basin.
12/18/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Granite construction is installing a toe down along east/dividing line of site and riparian area.
12/05/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor installing toe down along southeastern Perimeter of basin. And riprap as shown on approved plan.
11/01/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Two superintendence on site or unaware of scheduled inspection and did not know what it was called. Please call for a preconstruction meeting 9150, and please provide contact information when scheduling inspections. Thank you Brian
11/01/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Two superintendence on site or unaware of scheduled inspection and did not know what it was called. Please call for a preconstruction meeting 9150, and please provide contact information when scheduling inspections. Thank you Brian
11/16/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/24/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. It appears as though the work may have been completed. The site is locked. There’s no activity at this time. Waiting for contractor to schedule all required inspections.
11/20/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Please install stormwater controls along perimeter fencing, correct track out protection and schedule inspections as needed at least Biweekly.
11/19/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Granite construction, Tep Kino substation.