Permit Status: Complete
Permit Description: *Restricted REcords**E SITE/GRADING/SWPPP - SALPOINTE CATHOLIC H.S. CENTER FOR THE ARTS
Start Date Submittal Complete Date Status  
01/24/2019 DEV PKG - RESUBMITTAL 01/29/2019 COMPLETED Review Details
10/17/2018 DEV PKG - OK TO SUBMIT 11/26/2018 COMPLETED Review Details
10/28/2018 DEV PKG - OK TO SUBMIT 11/30/2018 COMPLETED Review Details
12/03/2018 DEV PKG 01/11/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0282
Permit Description: *Restricted REcords**E SITE/GRADING/SWPPP - SALPOINTE CATHOLIC H.S. CENTER FOR THE ARTS
Total Completed Inspections - 11
Date Description Inspector Results Comments
03/21/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 03/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 02/26/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Track out protection has been installed.}
10/30/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/30/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 03/21/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 02/26/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - No plans}
12/04/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Approved. Project manager Matt at 904-2219 has taken over this project and will schedule inspections from his development package permit. Project is nearing completion. Work Starting in right of way. Provide right of way department of transportation inspections as required} ; {Activity date: 03/21/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - left open for informationally. Bob was diversified at 488-2418. Provide site address. SWPPP NoI has been posted. Controls have been installed. Call for intermediate inspection for all below grade storm drainage piping and bubblers at time of installation. There is no dumpster enclosure. Call for stormwater follow up inspections every two weeks.} ; {Activity date: 02/26/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Bob with diversified 488-2418 will schedule a preconstruction meeting when he is able to be on site and provide city approved plans for inspection.}
12/10/2020 SITE - Stormwater Follow-up Passed {Activity date: 12/10/2020; Status: Approved; Inspector: BBENENDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 10/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Work in progress. Minor track out on Copper Street. I left a message for Bob with Diversified.} ; {Activity date: 09/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No track out. Protection and temporary ramp at curb entrance still in place} ; {Activity date: 07/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Track out onto Copper Street.} ; {Activity date: 05/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. The job has been temporarily shut down due to the pandemic. Bob with diversified hopes to start working within the next week or so.} ; {Activity date: 03/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - There is notable track out on Copper Street.} ; {Activity date: 01/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is no track out.} ; {Activity date: 11/08/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 11/07/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Was unable to do this inspection today due to extended work downtown in the office. I will visit the job site tomorrow} ; {Activity date: 09/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor check out onto Copper Street. No concerns.} ; {Activity date: 09/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with Bob about protecting his material stock piles and the sidewalk to the south.} ; {Activity date: 08/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time however controls need to be reinstalled along South Fenceline, newly installed utilities have been backfilled. There is minor amounts of track out onto Copper Street, controls are in place.} ; {Activity date: 07/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time however I suggested to Bob th GC that he installed controls along the south portion of the fence} ; {Activity date: 07/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time, there is no track out to be noted and protection is in place.} ; {Activity date: 06/04/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS DURING SITE VISIT. CREWS WORKING ON BACKFILL AND COMPACTION ALONG THE SOUTH SIDE OF THE EXISTING STRUCTURES WEST OF THE PARKING LOT.} ; {Activity date: 05/21/2019; Status: Continued; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Minor track out on Copper Street. No concerns at this time.
} ; {Activity date: 05/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is some track out to be noted.} ; {Activity date: 04/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - All controls are in place site address is in place no issues or concerns at this time} ; {Activity date: 03/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - no concerns at this time}
12/10/2020 ENGR Grading Final Passed {Activity date: 12/10/2020; Status: Approved; Inspector: BBENENDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 05/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. The job has been temporarily shut down due to the pandemic. Bob with diversified hopes to start working within the next week or so.} ; {Activity date: 04/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - contractor installing perimeter fencing and completing work on building structures.

} ; {Activity date: 01/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Building construction in progress.

} ; {Activity date: 09/12/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Stormwater piping south of new building.} ; {Activity date: 09/06/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Bob and Steve with diversified construction.
below ground PVC rain leaders from existing building.} ; {Activity date: 07/30/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - OK FOR THE PLACEMENT OF BACKFILL OVER THE STORM DRAIN PIPING SYSTEM.} ; {Activity date: 07/24/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 18 inch catch basin’s with 10 inch and 8 inch SDR 35 as shown OK to cover.} ; {Activity date: 07/18/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - SDR 35 stormwater piping north east of the new building.} ; {Activity date: 05/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Bob from diversified. As install the main water line that}
12/11/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
12/11/2020 ENGR Engineering Final Passed {Activity date: 12/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
12/11/2020 SITE - Stormwater Final Inspection Passed {Activity date: 12/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
12/11/2020 COT - ENGR - Signage Final Passed {Activity date: 12/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
03/17/2021 COT - FCON - Sprinkler - Final Passed {Activity date: 03/17/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE IS NOT APPLICABLE FIRE INSPECTIONS ARE NOT REQUIRED CHECK WITH ARMANDO QUIROZ TODETERMINE IF THESE WERE NEEDED ON OTHER PERMITS} ; {Activity date: 12/23/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }
03/17/2021 COT - FCON - Fire - Final Passed {Activity date: 03/17/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE IS NOT APPLICABLE FIRE INSPECTIONS ARE NOT REQUIRED CHECK WITH ARMANDO QUIROZ TODETERMINE IF THESE WERE NEEDED ON OTHER PERMITS} ; {Activity date: 12/23/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }