Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP18-0282
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2020 | SITE - Stormwater Follow-up | BBENENDON | Approved | Entered by PAHUMAD1 - |
| 10/30/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by PAHUMAD1 - Continued. Work in progress. Minor track out on Copper Street. I left a message for Bob with Diversified. |
| 09/30/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No track out. Protection and temporary ramp at curb entrance still in place |
| 07/06/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Track out onto Copper Street. |
| 05/14/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. The job has been temporarily shut down due to the pandemic. Bob with diversified hopes to start working within the next week or so. |
| 03/24/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by SFLORES2 - There is notable track out on Copper Street. |
| 01/24/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - There is no track out. |
| 11/08/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues. |
| 11/07/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Was unable to do this inspection today due to extended work downtown in the office. I will visit the job site tomorrow |
| 09/12/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Minor check out onto Copper Street. No concerns. |
| 09/06/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - I spoke with Bob about protecting his material stock piles and the sidewalk to the south. |
| 08/22/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - There are no issues at this time however controls need to be reinstalled along South Fenceline, newly installed utilities have been backfilled. There is minor amounts of track out onto Copper Street, controls are in place. |
| 07/18/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues at this time however I suggested to Bob th GC that he installed controls along the south portion of the fence |
| 07/09/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues at this time, there is no track out to be noted and protection is in place. |
| 06/04/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DMERANZ1 - NO CONCERNS DURING SITE VISIT. CREWS WORKING ON BACKFILL AND COMPACTION ALONG THE SOUTH SIDE OF THE EXISTING STRUCTURES WEST OF THE PARKING LOT. |
| 05/21/2019 | SITE - Stormwater Follow-up | MRAMBER | Continued | Entered by DMERANZ1 - Minor track out on Copper Street. No concerns at this time. |
| 05/06/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There is some track out to be noted. |
| 04/11/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - All controls are in place site address is in place no issues or concerns at this time |
| 03/21/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - no concerns at this time |