Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/13/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved |
| 12/04/2020 |
ENGR Grading Final |
BBENENDON |
Approved |
Entered by PAHUMAD1 - |
| 12/10/2020 |
ENGR Grading Final |
BBENENDON |
Approved |
Entered by PAHUMAD1 - |
| 05/14/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. The job has been temporarily shut down due to the pandemic. Bob with diversified hopes to start working within the next week or so. |
| 04/24/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - contractor installing perimeter fencing and completing work on building structures.
|
| 01/24/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Building construction in progress.
|
| 09/12/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Stormwater piping south of new building. |
| 09/06/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Bob and Steve with diversified construction.
below ground PVC rain leaders from existing building. |
| 07/30/2019 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DMERANZ1 - OK FOR THE PLACEMENT OF BACKFILL OVER THE STORM DRAIN PIPING SYSTEM. |
| 07/24/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - 18 inch catch basin’s with 10 inch and 8 inch SDR 35 as shown OK to cover. |
| 07/18/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - SDR 35 stormwater piping north east of the new building. |
| 05/06/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Bob from diversified. As install the main water line that |
| 12/10/2020 |
ENGR Grading Final |
BBENENDON |
Approved |
Entered by PAHUMAD1 - |
| 10/30/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by PAHUMAD1 - Continued. Work in progress. Minor track out on Copper Street. I left a message for Bob with Diversified. |
| 06/01/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Work on site has resumed. |
| 02/26/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Site has been cleared and staked |