Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
2604 E SPEEDWAY BL
Apply Date:
06/21/2018
Applicant:
Description:
E SITE/GRADE - RAISING CANE'S

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0152
Permit Description: E SITE/GRADE - RAISING CANE'S
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/23/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
07/23/2019 SITE - Stormwater Follow-up Passed {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor track out.} ; {Activity date: 06/25/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some track out rock in Street, needs to be swept up.} ; {Activity date: 06/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time} ; {Activity date: 05/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - No Concerns at this time.} ; {Activity date: 04/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time} ; {Activity date: 03/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time my only concern is the north west corner of the property.}
07/23/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/06/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
07/24/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/06/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspection left open for information only. I met with superintendent on site, Jay with Parkway construction at 214-766-6908. The site is .7 acres and there’s no swppp requirements noted on the plan however the contractor is responsible for keeping the site contained. Track out rock has been installed and some waddle has been installed in the low areas. Call for inspection of stormwater follow up every couple of weeks. Use grading rebar inspection code for your trash enclosure footings and walls and slab. The owner and developer is Heights property his name is James 572 –0020. Parkway construction is the general contractor. Ron’s concrete is a concrete subcontractor. Three engineering is the engineer for the project D Chang is the architect.}
08/05/2019 COT - ENGR - Signage Final Passed {Activity date: 08/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - }
08/06/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/06/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PENDING PHOTO OF TREES STAKED CORRECTLY} ; {Activity date: 07/23/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Depress water harvesting area 4 as shown on your water harvesting plan, And as noted on your grading and landscaping plans.}
08/06/2019 ENGR Engineering Final Passed {Activity date: 08/06/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PENDING ALL CLOSEOUT DOCUMENTATION} ; {Activity date: 07/31/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Review notes from engineering final from inspector that has this area.}
08/06/2019 ENGR Grading Final Passed {Activity date: 08/06/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/06/2019 SITE - Stormwater Final Inspection Passed {Activity date: 08/06/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - PENDING ALL CLOSEOUT DOCUMENTATION} ; {Activity date: 07/31/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete work on approved plans.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
DP_COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
LP_COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
PC_ASSESSORS_COMBO_LETTER.PDF DOCUMENTS VIEW
COMMENT_RESPONSE_LETTER_02.PDF DOCUMENTS VIEW
LA_COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
DP_COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
LP_COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
1-17 OF 17.PDF DEVELOPMENT PACKAGE VIEW