Permit: DP18-0152

Parcel: 12501010B


Addresses:

2604 E SPEEDWAY BL

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
07/24/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by DMERANZ1 -
07/23/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by DMERANZ1 -
03/06/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - Inspection left open for information only. I met with superintendent on site, Jay with Parkway construction at 214-766-6908. The site is .7 acres and there’s no swppp requirements noted on the plan however the contractor is responsible for keeping the site contained. Track out rock has been installed and some waddle has been installed in the low areas. Call for inspection of stormwater follow up every couple of weeks. Use grading rebar inspection code for your trash enclosure footings and walls and slab. The owner and developer is Heights property his name is James 572 -0020. Parkway construction is the general contractor. Ron’s concrete is a concrete subcontractor. Three engineering is the engineer for the project D Chang is the architect.