Permit: DP18-0152

Parcel: 12501010B


Addresses:

2604 E SPEEDWAY BL

Inspection Status: Passed

Inspection History: PDSD Site/Engineering Division - Landscaping

Date Description Inspector Results Comments
07/24/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Approved Entered by DMERANZ1 -
07/23/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Denied Entered by DMERANZ1 - Depress water harvesting area 4 as shown on your water harvesting plan, And as noted on your grading and landscaping plans.
07/12/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Continued Entered by DMERANZ1 - I walk the site with Jay the superintendent. Water harvesting plan shows a 9 inch depression, however the sidewalk elevation is much lower than curb opening, I suggested splitting the difference and providing a swale throughout the landscape area as shown. Installing curbs and forming for sidewalks, I reminded the installer to maintain less than a 2 percent Cross slope
08/06/2019 PDSD Site/Engineering Division - Landscaping DROBERTS Approved Entered by DROBERT5 -
08/02/2019 PDSD Site/Engineering Division - Landscaping DROBERTS Partial Approval Entered by DMERANZ1 - PENDING PHOTO OF TREES STAKED CORRECTLY
07/23/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Denied Entered by DMERANZ1 - Depress water harvesting area 4 as shown on your water harvesting plan, And as noted on your grading and landscaping plans.