Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 07/24/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 07/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Denied |
Entered by DMERANZ1 - Depress water harvesting area 4 as shown on your water harvesting plan, And as noted on your grading and landscaping plans. |
| 07/12/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Continued |
Entered by DMERANZ1 - I walk the site with Jay the superintendent. Water harvesting plan shows a 9 inch depression, however the sidewalk elevation is much lower than curb opening, I suggested splitting the difference and providing a swale throughout the landscape area as shown.
Installing curbs and forming for sidewalks, I reminded the installer to maintain less than a 2 percent Cross slope |
| 08/06/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/02/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DMERANZ1 - PENDING PHOTO OF TREES STAKED CORRECTLY |
| 07/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Denied |
Entered by DMERANZ1 - Depress water harvesting area 4 as shown on your water harvesting plan, And as noted on your grading and landscaping plans. |