Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
06/15/2018
Applicant:
Lisa Bowers
Description:
E SITE/GRADE - APARTMENT BUILDINGS, 1330 E. Drachman Street.

Permit Reviews

Permit Number - DP18-0147
Permit Status: Complete
Permit Description: E SITE/GRADE - APARTMENT BUILDINGS, 1330 E. Drachman Street.
Start Date Submittal Complete Date Status  
03/18/2019 DEV PKG - REVISION 04/16/2019 COMPLETED Review Details
04/17/2019 REVISION - - 2ND 05/08/2019 COMPLETED Review Details
06/13/2018 DEV PKG - OK TO SUBMIT 06/18/2018 COMPLETED Review Details
06/18/2018 DEV PKG 07/17/2018 COMPLETED Review Details
09/05/2018 DEV PKG - RESUBMITTAL 10/26/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0147
Permit Description: E SITE/GRADE - APARTMENT BUILDINGS, 1330 E. Drachman Street.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/15/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
07/24/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/28/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor has SWPPP paperwork. Post your signage and complete installation of controls.
} ; {Activity date: 02/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - I spoke with Dave superintendent, and provided him with city of Tucson preconstruction meeting form. I instructed him to install stormwater controls and to call for preconstruction meeting. He said his Engineer of record has instructed him on where to install stormwater controls.} ; {Activity date: 02/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Dave Roberts has instructed me to require an Anna lie from the state of Arizona for your swift requirements and that you install stormwater controls as required. Schedule a preconstruction meeting from your DP permit. Fill out the city of Tucson preconstruction meeting form and provide this to the inspecto} ; {Activity date: 02/14/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - This was an unscheduled inspection for Dave with CTC renovations at 818–3 12–6116. Note this project is well underway, this project is just over 1 acre, but no NOI has been obtained, no stormwater controls have been installed. Provide approved permits. Schedule inspections from DP permits for all work shown on DP plan except for retaining walls. Track out onto all public street shall be cleaned. Provide SWIPP and controls as required and schedule Stormwater inspections by weekly.}
08/22/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/22/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
08/23/2019 ENGR Engineering Final Passed {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/22/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete Walkway at the pool gate.
Condensate may not terminate on to accessible walkway.} ; {Activity date: 07/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Engineering is it OK for a temporary certificate of occupancy, provided that all areas requiring corrections and finishing will be properly barricaded. This decision is based on the fact that these are individual dwelling units with private parking garage’s.
Correct accessible parking, accessible ramps and landings, complete the landscaping, complete the trash enclosures.}
08/23/2019 SITE - Stormwater Follow-up Passed {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Clean track out from Street} ; {Activity date: 05/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out
} ; {Activity date: 04/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is some track out in the street to be noted, there are also small pieces of wood in the street please use larger of more stable materials at curb entrances. There is no track out protection at the new temporary entrance.} ; {Activity date: 04/01/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time} ; {Activity date: 02/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is small amounts of mud in the streets around the site as well as some construction debris. Controls have not yet been installed. There is no one on site today due to inclement weather.} ; {Activity date: 02/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There’s quite a bit of muddy track out due to the recent rains in the muddy conditions of the site.} ; {Activity date: 02/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor track out onto Drachman . Superintendent has been asked to keep the streets clean}
08/23/2019 ENGR Grading Final Passed {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/06/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - WALKED THE SITE TO CHECK ON THE SPECIFICATIONS FOR THE ROCK RIP RAP AND ITS INFIELD PLACEMENT.} ; {Activity date: 07/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Final grading of parking area and installing sidewalks and curbs.} ; {Activity date: 05/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is installing site utilities.} ; {Activity date: 03/14/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Trash enclosure walls are ready for grout to 6 feet.
Contractor has started to install storm water controls. I reminded Dave that he needs to clean the street and post his address and SWPPP signage.} ; {Activity date: 02/28/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Trash enclosure walls to 4 feet with a bond beam and ladder wire and steal at 32 inches and in corners
} ; {Activity date: 02/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Project is well underway, buildings are being installed}
08/23/2019 SITE - Stormwater Final Inspection Passed {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide notice of termination.}
08/23/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 04/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Provide track out protection at new site entrance} ; {Activity date: 02/28/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Dave is working on installing controls.
} ; {Activity date: 02/14/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - None have been installed}
08/23/2019 COT - ENGR - Signage Final Passed {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
1-10 OF 10.PDF DEVELOPMENT PACKAGE VIEW
APPLICATION.PDF DOCUMENTS VIEW
BLDG ELEVATIONS.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTERS.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
NPPO EXCEPTION.PDF DOCUMENTS VIEW
SIGNED PERMIT.PDF DOCUMENTS VIEW
SWPPP_01-02.PDF DOCUMENTS VIEW
INSPECTION JOB CARD.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
REVISION LETTER, 04.17.19.PDF DOCUMENTS VIEW