Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 07/24/2019 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by DMERANZ1 - Accessible parking spaces, accessible route from the street, and one ramp exceed the maximum allowed slopes. Landscaped areas shall be depressed 6 inches. The letter From your engineer of record certifying grade conformity to approve documents will be required for final. |
| 08/23/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 08/22/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete Walkway at the pool gate.
Condensate may not terminate on to accessible walkway. |
| 07/24/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Engineering is it OK for a temporary certificate of occupancy, provided that all areas requiring corrections and finishing will be properly barricaded. This decision is based on the fact that these are individual dwelling units with private parking garage’s.
Correct accessible parking, accessible ramps and landings, complete the landscaping, complete the trash enclosures. |