Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
05/22/2018
Applicant:
James McMurtrie
Description:
E SITE/GRADE/SWPPP - 1333 E DRACHMAN ST

Permit Reviews

Permit Number - DP18-0120
Permit Status: Complete
Permit Description: E SITE/GRADE/SWPPP - 1333 E DRACHMAN ST
Start Date Submittal Complete Date Status  
03/18/2019 DEV PKG - REVISION 04/16/2019 COMPLETED Review Details
05/22/2018 DEV PKG - OK TO SUBMIT 05/25/2018 COMPLETED Review Details
05/29/2018 DEV PKG 08/03/2018 COMPLETED Review Details
09/05/2018 DEV PKG - RESUBMITTAL 10/29/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0120
Permit Description: E SITE/GRADE/SWPPP - 1333 E DRACHMAN ST
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/02/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/02/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/02/2019 COT - ENGR - Signage Final Passed {Activity date: 10/02/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/04/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 09/10/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has started landscaping.
}
10/04/2019 SITE - Stormwater Final Inspection Passed {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/04/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - contractor has started to install storm water controls. I reminded Dave that GC that he needs to clean the streets and post his address and SWPPP signage.} ; {Activity date: 02/28/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - No controls installed at this time Dave is working on it. 0915 for Stormwater follow up, continues. Contractor is required to keep the streets clean from any dirt or debris’s.
} ; {Activity date: 02/14/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - None have been installed}
10/04/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/28/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - General contractor Dave has an NOI for each site. Number is 75620 and 75622. Post your signage. Install stormwater controls.
} ; {Activity date: 02/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - I spoke with Dave superintendent, and provided him with city of Tucson preconstruction meeting form. I instructed him to install stormwater controls and to call for preconstruction meeting. He said his Engineer of record has instructed him on where to install stormwater controls.} ; {Activity date: 02/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Dave the GC is not on site, I left inspection results paperwork on his door. Please provide NOI And install storm water controls as required, please schedule a preconstruction meeting, please fill out a city of Tucson preconstruction form to be provided to the inspector} ; {Activity date: 02/14/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - This was an unscheduled inspection for Dave with CTC renovations at 818–3 12–6116. Note this project is well underway, this project is just over 1 acre, but no NOI has been obtained, no stormwater controls have been installed. Provide approved permits. Schedule inspections from DP permits for all work shown on DP plan except for retaining walls. Track out onto all public street shall be cleaned. Provide SWIPP and controls as required and schedule Stormwater inspections by weekly}
10/14/2019 ENGR Engineering Final Passed {Activity date: 10/14/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/14/2019 SITE - Stormwater Follow-up Passed {Activity date: 10/14/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 09/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Landscaper has a large pile of dirt blocking public alley.} ; {Activity date: 08/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with superintendent Dave about cleaning and keeping the sidewalks And streets clean of dirt and construction debris prior to the end of the day.} ; {Activity date: 08/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is installing final grade, and perimeter fencing. Temporary fencing has been removed. No issues at this time, the only concern is keeping the sidewalks clear from dirt.
} ; {Activity date: 07/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor needs to remove the mud and dirt from the streets around the project.} ; {Activity date: 05/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out to be noted. Also perimeter fencing is being pushed over by dirt piles the south end of the site.
} ; {Activity date: 04/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no concerns at this time} ; {Activity date: 04/01/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Controls have been installed there are no issues at this time.} ; {Activity date: 03/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - there is minor check out in the street to be noted} ; {Activity date: 02/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There’s quite a bit of muddy track out due to the recent rains in the muddy conditions of the site.} ; {Activity date: 02/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor track out onto Drachman . Superintendent has been asked to keep the streets clean.}
10/14/2019 ENGR Grading Final Passed {Activity date: 10/14/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
1-10 OF 10.PDF DEVELOPMENT PACKAGE VIEW
APPLICATION.PDF DOCUMENTS VIEW
BLDG ELEVATIONS.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTERS.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
NPPO EXCEPTION.PDF DOCUMENTS VIEW
SIGNED PERMIT.PDF DOCUMENTS VIEW
SWPPP_01-02.PDF DOCUMENTS VIEW
REVISION LETTER, 03.13.2019.PDF DOCUMENTS VIEW