Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0120
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - |
02/28/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by CBELL1 - General contractor Dave has an NOI for each site. Number is 75620 and 75622. Post your signage. Install stormwater controls. |
02/19/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by CBELL1 - I spoke with Dave superintendent, and provided him with city of Tucson preconstruction meeting form. I instructed him to install stormwater controls and to call for preconstruction meeting. He said his Engineer of record has instructed him on where to install stormwater controls. |
02/15/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Dave the GC is not on site, I left inspection results paperwork on his door. Please provide NOI And install storm water controls as required, please schedule a preconstruction meeting, please fill out a city of Tucson preconstruction form to be provided to the inspector |
02/14/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by CBELL1 - This was an unscheduled inspection for Dave with CTC renovations at 818-3 12-6116. Note this project is well underway, this project is just over 1 acre, but no NOI has been obtained, no stormwater controls have been installed. Provide approved permits. Schedule inspections from DP permits for all work shown on DP plan except for retaining walls. Track out onto all public street shall be cleaned. Provide SWIPP and controls as required and schedule Stormwater inspections by weekly |