Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP18-0120
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2019 | ENGR Engineering Final | BBENEDON | Approved | Entered by KROBLES1 - PER SSHIELDS OPENING WITH THE 33 INCHES IA ALLOWED OK TO ISSUE C OF O |
10/14/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Builder David Levi, see Steve Shields at the zoning desk and obtain city approved plans showing the dimension of the gate openings. |
10/08/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - I spoke with James from dynamic civil engineering and informed him that we need a permit for the perimeter fencing around the site. I also discussed the concerns I have about that 34 inch opening of the gates at the pedestrian access. He said 32 is acceptable within a 24 inch. Area and he will send the code to me and he will send it to Steve Shields as well. |
10/04/2019 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy. Correct the slope of the drop off zone in between the two accessible spaces, as well as the concrete walkway at the front of the loading zone. The rest of the sidewalks were checked and deemed acceptable.Correct the accessible opening dimension at the gate crossing the accessible routes onto the property. Provide a City of Tucson permit from zoning in the planning and development services department for the perimeter fencing not shown on your city approved plans. |
10/02/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Complete work at dumpster enclosure. Reschedule inspection to check cross slopes, no level available at this time. Per Dave Roberts, Contractor needs to see Steve shields about 34 1/2 inch clear opening for perimeter fencing not shown on plan at accessible walkways. A plan revision or permit may be required For this work not showing on your approved drawings. |
10/14/2019 | ENGR Engineering Final | BBENEDON | Approved | Entered by DMERANZ1 - |