Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
01/17/2018
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - El Rio Southeast Expansion.

Permit Reviews

Permit Number - DP18-0016
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - El Rio Southeast Expansion.
Start Date Submittal Complete Date Status  
01/17/2018 DEV PKG - OK TO SUBMIT 01/23/2018 COMPLETED Review Details
01/23/2018 DEV PKG 03/23/2018 COMPLETED Review Details
03/01/2019 DEV PKG - REVISION 03/20/2019 COMPLETED Review Details
03/23/2018 DEV PKG - RESUBMITTAL 05/02/2018 COMPLETED Review Details
05/02/2018 DEV PKG - RESUBMITTAL 06/22/2018 COMPLETED Review Details
08/13/2019 DEV PKG - REVISION 09/04/2019 COMPLETED Review Details
11/04/2019 DEV PKG - OK TO SUBMIT 12/10/2019 COMPLETED Review Details
12/10/2019 REVISION - - 2ND 12/19/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0016
Permit Description: SITE/GRADING/SWPPP - El Rio Southeast Expansion.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/11/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 09/11/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/18/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/18/2019 SITE - Stormwater Follow-up Passed {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/24/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.
} ; {Activity date: 09/13/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 07/17/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/18/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with GC.} ; {Activity date: 06/07/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Working on permanent controls at this time.} ; {Activity date: 05/29/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site check for temporary controls Temporary and permanent controls or installed around site.} ; {Activity date: 05/15/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 04/24/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - THERE APPEARS TO BE NO CONCERNS ON SITE AT THIS TIME. SOME OF THE CONTROLS HAVE BEEN MOVED IN PREPARATION OF ABC & ASPHALT IN NEAR FUTURE. THE CONTRACTOR WILL BE PLACING SOME DUST PALLIATIVE MATERIAL AT THE END OF THE DAY. I WILL RE-INSPECT THIS SITE ON FRIDAY OF THIS WEEK TO VERIFY THAT ALL OF THE MODIFICATIONS HAVE BEEN COMPLETED PRIOR TO THE WEEKEND.} ; {Activity date: 04/09/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Met with GC on site} ; {Activity date: 02/27/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Swept controls in compliance} ; {Activity date: 02/15/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STARTING TO GET TRACK OUT ON STREET.} ; {Activity date: 02/13/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/05/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT REMOVEING TRACK OUT IN PARKING AREAS AND STREETS.} ; {Activity date: 01/31/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OU AT THIS TIME.} ; {Activity date: 01/04/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 12/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/11/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT AND WASH OUT.} ; {Activity date: 09/25/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/11/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PICKED UP PRE-CON PACKED.} ; {Activity date: 09/06/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/04/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN MADE.}
11/18/2019 SITE - Stormwater Final Inspection Passed {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/18/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/18/2019 COT - ENGR - Signage Final Passed {Activity date: 11/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/27/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/27/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/15/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC on site went over conversation with John Van Winkle about depression in landscaped areas.} ; {Activity date: 11/14/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - PREVIOUSLY APPROVED, RE-OPENED FOR RE-INSPECTION}
11/27/2019 ENGR Grading Final Passed {Activity date: 11/27/2019; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - }
12/20/2019 ENGR Engineering Final Passed {Activity date: 12/20/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by PMARTIN1 - } ; {Activity date: 12/19/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Pending approved revision.} ; {Activity date: 12/03/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete notes from last inspection for grading final.} ; {Activity date: 11/29/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR TCO PER ALL OTHER APPROVALS, SITE NEEDS TO HAVE THE REVISED DRAWINGS SUBMITTED AND APPROVED FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR TH DEVELOPMENT PACKAGE DP18-0016, AS WELL AS THE NOTICE OF TERMINATION FROM ADEQ FOR THE DEVELOPMENT PACKAGE.} ; {Activity date: 11/27/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Provide COT approved revisions for additional ADA parking on north side of building and any other changes to approved plans for grading and drainage. Provide certification letter from engineer of record for all grading and drainage per Dave Roberts any questions contact Dave Roberts at 349-7643. OK for TCO.} ; {Activity date: 11/14/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete notes from the engineering final.}

Documents

File Name Document Type  
1-13 OF 13.PDF DEVELOPMENT PACKAGE VIEW
1E_EL_RIO_SE_II_DEVEL_APP_.PDF DOCUMENTS VIEW
1B_EL_RIO_SE_II_CHECKLIST.PDF DOCUMENTS VIEW
2B_EL_RIO_SE_CRL_DP_1ST_SUB_2018-03-19.PDF DOCUMENTS VIEW
2F_EL_RIO_SE_REZONING_RESPONSE_LETTER.PDF DOCUMENTS VIEW
1C_EL_RIO_SE_II_SWPPP.PDF DOCUMENTS VIEW
1D_EL_RIO_SE_II_DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
CIVIL_RESPONSE, 08.09.19.PDF DOCUMENTS VIEW
LANDSCAPE_RESP, 08.09.19.PDF DOCUMENTS VIEW
REVISION LETTER, 02.27.2019.PDF DOCUMENTS VIEW
REVISION_LETTER, 12.04.19.PDF DOCUMENTS VIEW