| 11/18/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Approved |
Entered by DMERANZ1 - |
| 10/24/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - No concerns at this time.
|
| 09/13/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - No concerns at this time. |
| 07/17/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 06/18/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walk site with GC. |
| 06/07/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Working on permanent controls at this time. |
| 05/29/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walk site check for temporary controls Temporary and permanent controls or installed around site. |
| 05/15/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - No concerns at this time. |
| 04/24/2019 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by CBELL1 - THERE APPEARS TO BE NO CONCERNS ON SITE AT THIS TIME. SOME OF THE CONTROLS HAVE BEEN MOVED IN PREPARATION OF ABC & ASPHALT IN NEAR FUTURE. THE CONTRACTOR WILL BE PLACING SOME DUST PALLIATIVE MATERIAL AT THE END OF THE DAY. I WILL RE-INSPECT THIS SITE ON FRIDAY OF THIS WEEK TO VERIFY THAT ALL OF THE MODIFICATIONS HAVE BEEN COMPLETED PRIOR TO THE WEEKEND. |
| 04/09/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by CBELL1 - Met with GC on site |
| 02/27/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by CBELL1 - Swept controls in compliance |
| 02/15/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - STARTING TO GET TRACK OUT ON STREET. |
| 02/13/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/05/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT REMOVEING TRACK OUT IN PARKING AREAS AND STREETS. |
| 01/31/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO TRACK OU AT THIS TIME. |
| 01/04/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 12/17/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 12/11/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 10/19/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT AND WASH OUT. |
| 09/25/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 09/19/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 09/11/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - PICKED UP PRE-CON PACKED. |
| 09/06/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 09/04/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN MADE. |