Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0016
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by DMERANZ1 - |
03/04/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Matt for trashing closure OK. |
12/13/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Vertical rebar and bond Beam for trash enclosure okay |
12/12/2018 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - WORKING ON WALL FOR TRASH ENCLOSUER . |
11/27/2018 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by CBELL1 - Footer for trash enclosure okay. |
11/18/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by DMERANZ1 - |
06/18/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC went over work to be done for TCO. |
06/07/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC checked some slopes on East side of site. |
06/06/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC went over temporary ADA parking for TCO. |
05/29/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC putting down AB working on first phase of site. |
05/07/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Met with general contractor on site went over plans for ADA parking and temporary ADA parking. |
11/27/2019 | ENGR Grading Final | DROBERT5 | Approved | Entered by DROBERT5 - |
11/27/2019 | ENGR Grading Final | DROBERT5 | Approved | Entered by DROBERT5 - |