Permit: DP18-0016

Parcel: 13624447B

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
11/18/2019 ENGR Grading Final RLEDONNE Approved Entered by DMERANZ1 -
03/04/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Matt for trashing closure OK.
12/13/2018 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Vertical rebar and bond Beam for trash enclosure okay
12/12/2018 ENGR Grading Final RLEDONN1 Continued Entered by RLEDONN1 - WORKING ON WALL FOR TRASH ENCLOSUER .
11/27/2018 ENGR Grading Final RLEDONNE Partial Approval Entered by CBELL1 - Footer for trash enclosure okay.
11/18/2019 ENGR Grading Final RLEDONNE Approved Entered by DMERANZ1 -
06/18/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC went over work to be done for TCO.
06/07/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC checked some slopes on East side of site.
06/06/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC went over temporary ADA parking for TCO.
05/29/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC putting down AB working on first phase of site.
05/07/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Met with general contractor on site went over plans for ADA parking and temporary ADA parking.
11/27/2019 ENGR Grading Final DROBERT5 Approved Entered by DROBERT5 -
11/27/2019 ENGR Grading Final DROBERT5 Approved Entered by DROBERT5 -