Permit: DP18-0009
Permit Details
Status:
Complete
Type:
Development Package
Address:
3271 E VALENCIA RD
Address NEW:
3271 E VALENCIA RD
Apply Date:
01/11/2018
Applicant:
Description:
SITE/GRADE/SWPPP - AUTOZONE1st revision approved 06/08/18 (sheet 1)2nd revision approved 07/23
Permit Reviews
Permit Number - DP18-0009
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - AUTOZONE1st revision approved 06/08/18 (sheet 1)2nd revision approved 07/23
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/11/2018 | DEV PKG - OK TO SUBMIT | 01/11/2018 | COMPLETED |
| 01/18/2018 | DEV PKG | 02/28/2018 | COMPLETED |
| 03/21/2018 | DEV PKG - RESUBMITTAL | 04/25/2018 | COMPLETED |
| 04/25/2018 | DEV PKG - RESUBMITTAL | 05/23/2018 | COMPLETED |
| 06/08/2018 | DEV PKG - REVISION | 06/08/2018 | COMPLETED |
| 07/23/2018 | DEV PKG - REVISION | 07/25/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP18-0009
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - AUTOZONE1st revision approved 06/08/18 (sheet 1)2nd revision approved 07/23
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/27/2018 | Analysis of existing drywell, to confirm infiltration rates/capacity, will be required prior to building final |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0009
Permit Description: SITE/GRADE/SWPPP - AUTOZONE1st revision approved 06/08/18 (sheet 1)2nd revision approved 07/23
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 10/04/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/04/2018 | ENGR Grading Final | Passed | {Activity date: 10/04/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/04/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/04/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/04/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/04/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/04/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 10/04/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/05/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/05/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/28/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Contractor installing} | |
| 10/05/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/05/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/04/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY FOR FINAL, MINOR CLEANUP NEEDED THROUGHOUT THE SITE} ; {Activity date: 09/28/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Controls inplace, no issues.} | |
| 10/05/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 10/05/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/04/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/10/2018 | ENGR Engineering Final | Passed | {Activity date: 10/10/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/09/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL SITE WORK AS SHOWN ON THE APPROVED PLANS. 1) REMOVE ALL ROLL OFF BINS FROM THE SITE 2) COMPLETE THE STAKING OF THE TREES ANS SHOWN ON THE APPROVED PLANS. REMOVE ALL NURSARY STAKES AS NEEDED FROM TREES AND STAKE ACCORDINGLY AS NEEDED THROUGHOUT THIS SITE. 3) INSTALL HYDROSEE OR D.G. IN ALL AREAS WHERE THE SOILS HAVE BEEN DISTURBED. THIS WILL INCLUDE THE AREA OF THE DRAINAGE EASEMENT ON THE NORTHSIDE, AS WELL AS THE VACANT LOT ALONG THE WEST SIDE OF THIS SITE. 4) COMPLETE THE TRASH ENCLOSURE AS SHOWN ON THE APPROVED PLANS. THIS WILL INCLUDE THE DRILLING OF THE PIN HOLES IN THE CONCRETE IN THE CLOSED POSITION. 5) REMOVE ALL EXCESS MATERIAL AND CONCRETE SPOILS FROM THE VACANT LOT ON THE WEST SIDE OF THE IS PROPERTY AND PLACE D.G. OR HYDROSEED AS NOTED IN ITEM NUMBER 3.} ; {Activity date: 10/04/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL SITE WORK PRIOR TO CALLING IN FOR THE FINAL} ; {Activity date: 09/20/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |